Laserfiche WebLink
Element 13. Protect low impact development: <br /> ❑ BMP C102: Buffer Zones <br /> ❑ BMP C103: High Visibility Plastic or Metal Fence <br /> ❑ BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207: Check Dams <br /> ❑ BMP C208:Triangular Silt Dike (Geotextile Encased Check Dam) <br /> ❑ BMP C231: Brush Barrier <br /> IP BMP C233 Silt Fence <br /> ❑ BMP C 234:Vegetated Strip <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> 0 Task 3: Construction SWPPP drawings <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> • Show on your TESC Plan all BMPs selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> • See City of Everett Public Works TESC Plan Example#103 <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction Stormwater Pollution Prevention Plans(Construction SWPPPs) that <br /> involve engineering calculations must also be prepared by or under the direction of a <br /> Washington State professional licensed engineer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 12 <br />