Laserfiche WebLink
11/24/2021 Page <br /> City of Everett <br /> 6:48:36AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1806-002 Site Address 3002 16TH ST <br /> Applied 6/5/2018 Applicant WOLFHILL GREG Lot <br /> Approved 10/4/2018 Owner MURRAY TERRENCE Block <br /> Issued 10/4/2018 Contractor OWNER Tract <br /> Parent Permit No. Description NEW 20 X 24 GARAGE WITH ADU UPSTAIRS <br /> Notes <br /> Scheduled Completed Tune Inspector Result Remarks Insoector's Comments <br /> 10/8/2018 10/8/2018 PLUMB SDP OTHER Discussed sewer line <br /> 01-CONSULTATIO elevations <br /> 10/22/2018 10/22/2018 BLDG 04-UFER KMK APPROVAL <br /> GROUND <br /> 10/22/2018 10/22/2018 BLDG KMK APPROVAL <br /> 02-FOOTING/SETB <br /> 10/22/2018 10/22/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 11/19/2018 11/19/2018 PLUMB RRS APPROVAL As noted 3"building C.O.(2)will be inside east wall. <br /> 02-GROUND Soft copper to be run from house to <br /> building addition(garage and dwelling unit <br /> on 2nd floor) <br /> Note:utility inspector to approve storm <br /> ground water pit. <br /> 5/8/2019 5/8/2019 BLDG KMK OTHER eTRAKiT Inspection 5/7/2019 9:50 PM Terrence Murray <br /> 01-CONSULTATIO Request need consultation on lower level framing. <br /> After 2;30 pm?? <br /> Contact Name:Terrence Murray <br /> Site Address:3002 16TH ST <br /> Phone:4257802937 <br /> e-Mail:terry98272@yahoo.com <br /> (5/8/2019 10:09 AM KMK) <br /> KMK changed Inspection Type from BLDG <br /> 08-FRAMING to BLDG <br /> 01-CONSULTATION <br /> (5/8/2019 3:18 PM KMK) <br /> Add hold downs per plan.If epoxy is used <br /> provide special inspection report. <br /> 8/30/2019 8/30/2019 BLDG KMK CORRECTION eTRAKiT Inspection 8/28/2019 8:13 PM Terrence Murray <br /> 07-EXTERIOR Request i will not be on site untill 3 pm I hope this <br /> works.If not,I can reshedule <br /> 425 780 2937 thank you <br /> Contact Name:Terrence Murray <br /> Site Address:3002 16TH ST <br /> Phone:4257802937 <br /> e-Mail:terry98272@yahoo.com <br /> (8/29/2019 3:17 PM KMK) <br /> kmk changed Inspection Date/Time from <br /> 08/29/2019 to 08/30/2019 <br /> (8/30/2019 2:47 PM KMK) <br /> 1.Block and nail all horizontal seams at <br /> panel edges per schedule <br /> 2.Fill all holes in MST48 straps <br /> INSPI2 <br /> CRIOVsY MS <br />