Laserfiche WebLink
PUBLIC /ORKS PERMIT •ate Applied: 6/21/2019 <br /> tzCity of Everett Permit Services Public Works Permit#: PW1906-062 <br /> EVERETT 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: REVI19-021 <br /> WASHINGTON 425-2.57-8810 Public Works Fee: $6014.41 <br /> 03 0EC 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EMORY'S LAKE HOUSE LLC BAXTER FRED <br /> 11830 19TH AVE SE <br /> EVERETT,WA,98204 , , <br /> PHONE: PHONE:4253483975 <br /> TAX PARCEL ID#:00463900101100 SITE ADDRESS: 1201119TH AVE SE <br /> DESCRIPTION:CONST OF NEW PAVED PARKING LOT FOR(31)CARS FOR VALET <br /> PARKING AND CONST OF STORMWATER VAULT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated XX/XX/2019.Approved plans must remain on job-site at all <br /> times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required inspections.Flyers <br /> are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan.Remove upon completion of the project prior to final <br /> approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to final app eal/cter'q it of <br /> the permit. I..-«:--•I-4 I-++---'•i--«h-•�.a _c: c' <br /> 10.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater infrastructur a1L¢@.,oulaRitig09 thg.ciiyrj ip4Tto fin tiapproval/close <br /> 4Loout of the permit. I_-—•i - ---i:z>717 - <br /> ;: cyI r-a c ::.L>R c' <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works InspectR Schedu #hidexrsiir +FllatTm` 4gndsc. e inspection <br /> under"My Active Inspections"in your dashboard on the Online Permitting Portal. c:}:a:: ' <br /> 12.A Stormwater Covenant shall be recorded by the applicant prior to permit final.A copy of the recorded document must be submitted to the Perm ounterr 1_, <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a finalaspection online by selecting PW 24-Ste Fi i rt'hin <br /> i Itthe Online Permitting Portal Inspection Requests for this permit when all items have been completed. id s--`Li <br /> s <br /> 0 .._« <br /> Public Works Permit Fee Breakdown: - <br /> +wr 1°”1`+iEr.e3.ir j <br /> Erosion Control $200.00 ' . ^"'"7« <br /> '=1 N 1::;?. i::1-fir-�*-Lii in I.c '�..,`i .,,,. <br /> Grade/Fill/Excavate(730CY) $190.00 •4•:•••, � •r F,i--«rTT,:_s c:r)r._..: ) <br /> Parking Lot Paving(11,6005.F) $58.00 Nr::1''23 ` y 4=> F, =y s � >..v` <br /> rRetaining wall-Rockery Over 4fFT(270 LNFT-5ft high) $150.00 c-x'- ... <br /> Driveway/Concrete Apron/Curb Cut Commercial $45.00 <br /> I.-...t t.31 <br /> PW Plan Review $701.58 <br /> PW Site Inspection $1,403.16 <br /> SW System Devlopment fee(13,715S.F.) $3,266.67 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> L"`1 the City of Everett from any and all claims for damages,costs,expenses,or <br /> I/ 2A 201 causes of action that may arise because of installation and maintenance of <br /> A roved for Construction( is Works) to the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> e•-.7-- --.--. „- - ------ 17-W/ ? <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of A ' ant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />