My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
710 84TH ST SE 2021-12-23
>
Address Records
>
84TH ST SE
>
710
>
710 84TH ST SE 2021-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2021 2:31:50 PM
Creation date
12/23/2021 2:31:21 PM
Metadata
Fields
Template:
Address Document
Street Name
84TH ST SE
Street Number
710
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLINNORKS PERMIT Date Applied: 4/23/2019 <br /> City of Everett Permit Services Public orks Permit#: PW1904-053 <br /> EVERETT 3200 Cedar Street, 2 Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Worktfele: si •'2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS:pI <br /> YAP RAFAEL G ROTHWELL JOE <br /> 710 84TH ST SE <br /> EVERETT,WA,98208 , , <br /> PHONE: PHONE:3602206777 <br /> TAX PARCEL ID#:28051800200700 SITE ADDRESS:710 84TH ST SE <br /> DESCRIPTION: REPAIR AND REPLACE CONCRETE DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 04/25/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove uporly4omPtff n of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway,;~;1u"i;) -=-' :;;:': ' r ,;:• <br /> 8. Protect all existing underground utilities during construction. �:,� -i;',i} ',} } . „ <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced irsj ervious surfaces w i,bbe managed <br /> on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easeri nts px:{cl he <br /> improvements located therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. RecRost a final inspection onlinOy <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit whetj,}- II items have been comp'tted. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's Vxpense if the City ever requires <br /> use of the right-of-way for municipal purposes. -- •.`' .�: <br /> Public Works Permit Fee Breakdown: 0 i =} <br /> I-..-.r... <br /> Driveway/Concrete Residence $25.00 <br /> PW Plan Review $20.00 • <br /> PW Site Inspection $20.00 <br /> System Development fee(1,000 S.F.) $248.70 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> A p,/ S �lq the City of Everett from any and all claims for damages,costs,expenses,or <br /> _- ! causes of action that may rise because of installation and maintenance of <br /> the improvement or of r right-of- ay use here to applied for and further <br /> proved for Construction(Public Works) Date agrees to remove s e u tic from the City and to replace public <br /> property damaged er <br /> _ (_C <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signatur o App(cant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER I TO BE DILIGENTLY PURSUED TO COMPLETEION.THIS PERMIT MAY BE CANCELLED BY <br /> THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE <br /> EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.