Laserfiche WebLink
December 8, 2021 <br /> JOB COMPLETE— EVERETT DOWNTOWN STREETSCAPE PROJECT <br /> To accept the Everett Downtown Streetscape Project as complete,and authorize <br /> the Mayor to sign the Certificate of Completion with Jansen, Inc. <br /> AGREEMENT — ARCHITECTURAL DESIGN SERVICES FOR THE 2022 WATER <br /> FILTER PLANT'S BUILDING ROOF REPLACEMENT PROJECT <br /> To authorize the Mayor to sign the Professional Services Agreement with 2812 <br /> Architectural to provide architectural design services for the 2022 Water Filter <br /> Plant's Building Roof Replacement Project in the amount of$42,110.00. <br /> AGREEMENT AMENDED — BEVERLY LAKE WATER QUALITY RETROFIT <br /> PROJECT <br /> To authorize the Mayor to sign Amendment No. 1 to Water Quality Combined <br /> Financial Assistance Agreement for the Beverly Lake Water Quality Retrofit <br /> Project. <br /> AGREEMENT — COST SHARING FOR JETTY LANDING RESTROOM CAPITAL <br /> IMPROVEMENTS <br /> To authorize the Mayor to sign a Successor Interlocal Agreement for cost sharing <br /> for Jetty Landing Restroom Capital Improvements. <br /> JOB COMPLETE — BIOSOLIDS & BACKWASH SOLIDS REMOVAL PROJECT <br /> To accept the 2021 Biosolids & Backwash Solids Removal Project as complete <br /> and authorize the Mayor to sign the Certificate of Completion with Merrell <br /> Brother's Inc. in the amount of$781,485.74. <br /> AGREEMENT AMENDED—WPCF WASTEWATER TOXICITY TESTING <br /> To authorize the Mayor to sing Amendment No. 2 of the Professional Services <br /> Agreement with Rainier Environmental Laboratory to provide for wastewater <br /> toxicity testing at the Water Pollution Control Facility. <br /> 5 <br />