My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3851-21
>
Ordinances
>
Ordinance 3851-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 9:26:46 AM
Creation date
1/7/2022 9:26:43 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3851-21
Date
12/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br /> WASHINGTON <br /> ORDINANCE NO. 3851-21 <br /> An ORDINANCE creating a special improvement project entitled"Port of Everett Combined Sewer <br /> Main" Fund 336, Program 025,to accumulate all costs for the improvement and repealing Ordinance <br /> No. 3823-21 <br /> WHEREAS, <br /> A. The City of Everett is committed to a planned sewer system infrastructure maintenance <br /> improvement and replacement program. <br /> B. The City of Everett has identified the need and obtained funds to construct new facilities to <br /> comply with emerging regulations. <br /> NOW,THEREFORE,THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1. A special improvement project is hereby established as Fund 336, Program 025, entitled <br /> "Port of Everett Combined Sewer Main" to accumulate all costs for the improvement. Authorization is <br /> hereby given to accumulate costs and distribute payments for the improvement project. Ordinance No. <br /> 3823-21 is hereby repealed. <br /> Section 2. Authorization is hereby granted for the "Public Works Director"or"City Engineer" under <br /> the direction of the Mayor,to assume full and complete responsibility for conducting all tasks and doing <br /> all things to accomplish the actions authorized in this ordinance. <br /> Section 3. The sum of$5,460,00 is hereby appropriated to Fund 336, Program 025, "Port of Everett <br /> Combined Sewer Main" as follows: <br /> A. Estimated Project Construction Costs $ 5,460,000 <br /> B. Source of Funds <br /> Fund 401—Water/Sewer Utility Fund $ 5,460,000 <br /> Section 4. The City Clerk and the codifiers of this Ordinance are authorized to make necessary <br /> corrections to this Ordinance including, but not limited to,the correction of scrivener's/clerical errors, <br /> references, ordinance numbering,section/subsection numbers, and any internal references. <br />
The URL can be used to link to this page
Your browser does not support the video tag.