My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 12/13/2021
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County 12/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:13 AM
Creation date
1/7/2022 1:16:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
12/13/2021
End Date
3/30/2027
Department
Public Works
Department Project Manager
Corey Hert
Subject / Project Title
Traffic Control Device & Street Light ILA
Public Works WO Number
PW3132
Tracking Number
0003138
Total Compensation
$5,000.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> TRAFFIC CONTROL DEVICE AND STREET LIGHT MAINTENANCE, <br /> ENGINEERING AND CONSTRUCTION SERVICES <br /> TRAFFIC CONTROL DEVICE MAINTENANCE SERVICES <br /> Traffic Signal Maintenance Services <br /> Traffic Signal Maintenance Services provided by the County consist of the following: <br /> Routine Maintenance - This is a monthly activity that includes inspection of the traffic signal <br /> cabinet/controller/program; a visual inspection of the display system; and a check of pedestrian <br /> push buttons, emergency pre-emption, and detection systems. Furthermore, appropriate records <br /> will be maintained in the controller cabinet and in the office file located in the Snohomish <br /> County Traffic Operations Office. Approximately one hour per month per intersection will be <br /> spent on routine maintenance. <br /> Re-lamp — Traffic signal indicators will be replaced as needed. It is estimated that <br /> approximately five hours per intersection will be spent on this activity. This is typically a two <br /> County employee operation, which includes a Signal Technician and an assistant to the Signal <br /> Technician for traffic control purposes. <br /> On-Call Emergency Response - This service provides 24 hour emergency response for traffic <br /> signal malfunctions. For estimating purposes, it is assumed that each signal will have two <br /> emergencies per year. There is a minimum of three hours of labor per on-call emergency <br /> response. This estimate of three hours of labor per on-call emergency response does not include <br /> additional materials, equipment charges, or labor costs associated with extraordinary <br /> circumstances such as weather-related problems, knock-downs, and acts of God that may result <br /> in significant equipment damage or destruction. <br /> Materials —The County will provide all supplies and materials for both routine and on-call <br /> emergency response. This does not include replacement of major components of a traffic signal <br /> or additional materials, equipment charges, or labor costs associated with extraordinary <br /> circumstances such as weather-related problems, knock-downs, and acts of God that may result s t <br /> in significant equipment damage or destruction. Any costs incurred by the County in providing <br /> such supplies and materials shall be reimbursed by the City according to the terms of Section 6 ? _ <br /> of the Agreement. <br /> Locating Underground Wiring — The County will locate all underground wiring associated <br /> with a traffic signal when requested by the Underground Utility Locate Center. <br /> i <br /> INTERLOCALAGREEMENT ExhibitA-1 3 ! <br /> BETWEEN SNOHOMISH COUNTY AND THE CITY OF EVERETT <br /> FOR TRAFFIC CONTROL DEVICE AND STREET LIGHT MAINTENANCE, <br /> ENGINEERING AND CONSTRUCTION SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.