Laserfiche WebLink
1/3/2022 City of Everett Page 1 <br /> 11:01:07AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1808-213 Site Address 840 N BROADWAY BLDG B <br /> Applied 8/30/2018 Applicant Lot <br /> Approved 8/30/2018 Owner GPT PROPERTIES TRUST Block <br /> Issued 8/30/2018 Contractor ALPHA&OMEGA ELECTRIC Tract <br /> Parent Permit No. Description WIRING 200 AMP SERVICE,INSTALL ELEC CAR CHARGERS <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 8/31/2018 8/31/2018 ELEC 01-GROUND MCB APPROVAL OK conduit in trench <br /> WORK <br /> 11/9/2018 11/9/2018 ELEC 09-FINAL TRA CORRECTION No access <br /> 1/11/2019 1/11/2019 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 1/10/2019 8:57 AM <br /> Request Cedric requesting PM final inspection for <br /> 1/11. <br /> Contact Name:Cedric <br /> Site Address:840 N BROADWAY <br /> Phone:4252523385 <br /> e-Mail:cwilliams@mugroup.com <br /> 1/10/2019 10:20 AM <br /> Wilson Lessley changed inspection type <br /> from Building Final to Electrical Final <br /> (1/11/2019 1:12 PM SKB) <br /> Breaker must be in the up position when <br /> on,tum over panel so that the main breaker <br /> is on is in the up position.Provide proper <br /> working clearance for panel.Have someone <br /> to meet on site to open transformer to verify <br /> bonding of XO. <br /> 12/7/2020 12/7/2020 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 5/27/2021 5/27/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> INSP12CRWsYSTEMS <br />