Laserfiche WebLink
PUBLIC CORKS PERMIT ate 3/29/2018 <br /> "IPPAI6,-A <br /> City of Everett Permit Services Public Works Permit#: PW1804-018 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: SMA16-011 <br /> (425)257-8810 Public Works Fee: $15,567.53 <br /> 2 0 AUG 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> y r. v:.• �'iF;°:� � <br /> EVERETT PORT OFN :I i A L ,' HITAKER BRANDON <br /> 1205 CRAFTSMAN WAY STE %r0 A. r �.; , k1 205 CRAFTSMAN WAY STE 200 <br /> EVERETT, WA, 98201 VERETT WA 98201 <br /> PHONE: 4252592164 JAN 03 2022 <br /> HONE: 4252592164 <br /> TAX PARCEL ID#: A RCH I V j_,.1) .ITE ADDRESS: 1000 BLK MILLWRIGHT LOOP S <br /> DESCRIPTION: SE Millwrigh • • • • • • `• • = • aterfront Place <br /> Roadway construction of a portion of the proposed Millwright Loop, a Central Marina parking access road, new Central Marina <br /> parking lot, Esplanade, and new open space/fire access lane adjacent to the Pacific Rim Plaza. The project includes site <br /> grading, earthwork, utilities (water, sewer, stormwater, electrical, lighting, telecom), paving, hardscape, and landscaping. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 8/14/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the <br /> attached handout for phone number and online instructions to Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit. Call the inspection line to request a Final for this permit <br /> when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate (7,760CY) $335.00 <br /> Paving (81,370sf) $406.85 <br /> PW Plan Review $4,875.23 <br /> PW Site Inspection $9,750.45 <br /> / City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> 8expenses,or causes of action that may arise because of installation and <br /> ���' i` �S O maintenance of the improvement or other right-of-way use here to applied <br /> pproved for Construction (Public Works) Dat for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date 400,4 r?�CW R— Ft%-zd—I <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> FL <br />