My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT OF EVERETT 2022-01-13
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT OF EVERETT
>
1205 CRAFTSMAN WAY PORT OF EVERETT 2022-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 2:04:11 PM
Creation date
1/11/2022 4:25:18 PM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT OF EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIcVORKS PERMIT Date Applied: 8/2/2018 <br /> 1"..446/„0„-A City of Everett Permit Services <br /> Public Works Permit#: PW1808-006 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: 131$o3-00t <br /> Everett,WA 98201 Planning Reference#: SMA16-011 <br /> (425)257-8810 Public Works Fee: $65.00 <br /> a <br /> OWNER NAME AND ADDRE• : APPROVAL, PPLICANT NAME AND ADDRESS: <br /> EVERETT PORT OF JAN 03 2022 :RANDON WHITAKER <br /> PO BOX 538 'ORT OF EVERETT <br /> EVERETT, WA, 98206 <br /> PHONE: ARCHIVED <br /> HONE: 4253880613 <br /> TAX PARCEL ID#: 29051800208100 SITE ADDRESS: 1205 CRAFTSMAN WAY <br /> DESCRIPTION: CENTRAL MARINA IMPROVEMENTS-PHASE 3: <br /> TRENCHING OF UTILITIES & MAINTENANCE DREDGING FROM 1010 14TH ST TO 1520 W MARINE VIEW DR <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 8/13/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the <br /> attached handout for phone number and online instructions to Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to <br /> request a Final for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Grade/Fill/Excavate (50CY) $25.00 <br /> PW Plan Review $20.00 n n <br /> PW Site Inspection $20.00 U <br /> SEA' 2 6 2018 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> gLI` /`� 3 /(✓2zerp expenses,or causes of action that may arise because of installation and <br /> 1 maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) ate for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date 2Y.l4-7fG-1� GT 2G-!$ <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.