Laserfiche WebLink
• • • • <br /> _ MARGINAL DOCK <br /> (� — —'CONNECTION FLOAT -- --- <br /> s �_ � /y \V\_\, . _______ <br /> i <br /> / <br /> 1 1 r--- <br /> BASE BID -- ,I )\ i - <br /> �-4IASEBID <br /> L --� / <br /> -Ai,-�— L..__ L 14TH ST IALA <br /> N <br /> - —— I -� FUTURE COMMERCIAL 1 1 I ^�_ �� WI / -=- <br /> • ....L <br /> i DEVELOPMENT BY �— c <br /> -- L.__.----- OTHERS, TYP.� �'—_ \ <br /> I _ ACTIVE RESIDENTI <br /> /7 AL <br /> —_ -----' \ \ ♦ DEVELOPMENT BY <br /> OLD <br /> K—DOCK I / ', ♦ OTHER CONTRACTORS <br /> C — 1 <br /> Ni i <br /> RECIPROCAi i <br /> L EXIST f <br /> , N ,, <br /> DOCK TO BE J—DOCK C — z <br /> REMOVED w <br /> N <br /> I ' p ♦ C <br /> I <br /> • ._ — 1 0- <br /> K—DOCK I <br /> C ,/ <br /> I ----- --- ♦ ♦ I� <br /> � �� GUEST DOCK 5 •� I i � <br /> 1 I�I I I j ' <br /> ADDITIVE4411110/‘ I <br /> c — <br /> I� ALTERNATE <br /> t I; - EXIST �` /I ,e' / ��I <br /> H DOCK ♦ FUTURE C — = I,. . # <br /> \ • . <br /> ♦ 1, <br /> FINGERS I <br /> I--- — — \ <br /> ,�.. ENTRANCECONSTRUCTION.— <br /> / N I <br /> GANGWAY C — = I EXIST SEINER \ ' ` � w <br /> a it <br /> EXIST L WHARF UTILITY ` S <br /> o I—DOCK ---I _ — CENTER _ __ <br /> _ w <br /> .......„ , <br /> ACTIVTY FLOAT ilk <br /> , I , . <br /> a STAGING AREA n <br /> P.Q.R. <br /> I FILL MATERIAL = <br /> BASE BID ` I <br /> m EXIST 111 PARKING I `� STOCKPILE <br /> it Q—DOCK CONTRACTOR SHALL III <br /> • , <br /> t —I NOT DRIVE EQUIPMENT <br /> o I i ON ESPLANADE a �� <br /> --� <br /> — — — 1 <br /> O <br /> EXIST EXIST SALVAGED TRANSITION RAMP MIAMIllim <br /> SEINER PIER R—DOCK I — .■ <br /> c FROM EXIST P-DOCK ��� 1 <br /> -- CONTRACTOR TO MAINTAIN 1 <br /> EXIST APPROACH TENANT ACCESS AND PARKING GANGWAY <br /> PIER THRU—OUT CONSTRUCTION SECURITY I / yI I <br /> $ / ------- <br /> . END OF L—DOCK CONNECTED GATE, TYP. 1 I c <br /> I / TO END OF R-DOCK <br /> S NOTE: -- l ( b <br /> o SEE DR1.01 FOR PLAN BASE BID <br /> i DREDGE WORK. <br /> m SCALE IN FEET <br /> 'f IF THIS DRAWING IS NOT <br /> W 22"x34" SCALE ACCORDINGLY. 50 0 50 IOD <br /> 3 PROJECT ENGINEER: SCALE: DWG. NO. <br /> ° u PND ENGINEERS,INC.IS NOT RESPONSIBLE FOR SAFETY g J. KEISER NOTED PORT OF EVERETT G1.04 <br /> PROGRAMS,METHODS OR PROCEDURES OF OPERATION,OR THE <br /> Port ofAo CONSTRUCTION OF THE DESIGN SHOWN ON HESE DRAWINGS. `M dN'b,/, DES'GNED BY DATE: CM I - PHASE 3 <br /> 7;36 Fourth Avenue S.Suite A WHERE SPECIFICATIONS ARE GENERAL OR NCT CALLED OUT, T, A C. FORNACE JULY 2018 CIP No. <br /> o \' © ® © pY 2-0-023-01 <br /> c - • Startle, 98134 FIE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF d387 <br /> v1 di,r_ DRAWN BY: CHECKED BY- <br /> 7 /4� VERETT w w.pnd'7 in INDUSTRY.DRAWINGS ARE FOR USE ON THIS PROJECT ONLY �7 <br /> In 1-.NGIAEERS,INC. www.pndenpneert.<om AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN ,,, `Fe Try Eo D. McDONALD PROJECT <br /> �� APPROVAL FROM PAD. DRAWINGS ARE ALSO NCT TO BE USED F :� " PROJECT PHASING PLAN NO. MR-CM-2018-01 <br /> j EVERETT,WA 88206 7/26/18 JBK ISSUED FOR BID AND CONSTRUCTION IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT SS/OVAL EaC' APPROVED BY: <br /> (425)259-3164 DIRECTLY OR INDIRECT_Y TO PRO. /p <br /> No. DATE BY REVISION Z�27I1 SHEET NO. 5 OF 82 <br />