My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2224 GRAND AVE 2022-01-14
>
Address Records
>
GRAND AVE
>
2224
>
2224 GRAND AVE 2022-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 9:03:38 AM
Creation date
1/12/2022 1:44:52 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2224
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/25/2021 City of Everett Page 1 j L <br /> 7:05:03AM' <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. CW1809-005 Site Address 2224 GRAND AVE <br /> Applied 9/28/2018 Applicant Lot <br /> Approved 11/28/2018 Owner KARR SUZANNE D Block <br /> Issued 11/30/2018 Contractor OWNER Tract <br /> Parent Permit No. W1806-003 Description FINISH PORTION OF UNFINISHED BASEMENT TO CREATE? <br /> Notes LIVING SPACE(500SF) <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> BLDG BDGI eTRAKiT Inspection 2/20/2020 7:04 PM David Hardy <br /> 11-INSULATION Request <br /> Contact Name:David Hardy <br /> Site Address:2224 GRAND AVE <br /> Phone:4255830555 <br /> e-Mail:dl.hardy@hotmail.com <br /> (Canceled-eTRAKiT-2/20/2020 7:05:20 <br /> PM) <br /> 12/21/2018 12/21/2018 BLDG DWF CORRECTION (12/21/2018 3:20 PM DWF) <br /> 08-FRAMING Work covered without inspection.Need <br /> electrical,mechanical and plumbing <br /> inspection before framing inspection. <br /> Uncover for building framing,structure <br /> attachment framing members and insulation <br /> R21. <br /> 12/31/2018 12/31/2018 MECH 04-ROUGH DXW CORRECTION Open up walls to see non-permitted <br /> IN plumbing work. <br /> Note:Floor may have to be removed to see <br /> pipe in slab. <br /> 5/20/2019 5/20/2019 PLUMB SDP CORRECTION Dave Hardy 425-583-0555 <br /> 03-ROUGH IN <br /> (5/20/2019 2:26 PM SDP) <br /> Re-plumb the vents for the downstairs <br /> bathroom.They must tie in above the flood <br /> rim of the upstairs fixtures or run <br /> independant through the roof. <br /> Notes:ok to cover the groundwork. <br /> Kitchen sink will have an air admittance <br /> valve in the cabinet under the sink. <br /> 5/20/2019 5/20/2019 MECH 04-ROUGH SDP APPROVAL (5/20/2019 2:28 PM SDP) <br /> IN Exhaust fan in the bathroom is ok to cover. <br /> 7/8/2019 7/8/2019 MECH 06-FINAL SDP APPROVAL eTRAKiT Inspection 7/5/2019 5:09 PM David Hardy <br /> Request <br /> Contact Name:David Hardy <br /> Site Address:2224 GRAND AVE <br /> Phone:4255830555 <br /> e-Mail:Dl.hardy@hotmail.com <br /> 7/8/2019 7/8/2019 PLUMB 06-FINAL SDP APPROVAL eTRAKiT Inspection 7/5/2019 5:07 PM David Hardy <br /> Request <br /> Contact Name:David Hardy <br /> Site Address:2224 GRAND AVE <br /> Phone:4255830555 <br /> e-Mail:Dl.hardy@hotmail.com <br /> 1/15/2020 1/15/2020 BLDG DWF NOT READY Need Electrical RI Dave 425-583-0555 <br /> 08-FRAMING before Framing access is on north side of house,down the <br /> stairs. <br /> (1/15/2020 7:44 AM DWF) <br /> Approved as noted-contractor to complete <br /> fire stopping and nail plate install,then ok <br /> to cover. <br /> INSP12 CRSYT , <br />
The URL can be used to link to this page
Your browser does not support the video tag.