Laserfiche WebLink
• <br /> Can we Avoid the Triggers? <br /> This permit application if for an exercise studio used 1-2 hours a day. We have developed the plan as <br /> we hope we can build. HOWEVER, if any of our planned work triggers a HUGE construction effort, <br /> to comply with building permit requirements, let us know and we will revise our plan... <br /> i.e. <br /> 1. we do not*need*to add insulation <br /> 2. we do not need to add GWB <br /> 3. we do not need to add electrical <br /> 4. we do not need to add a toilet exhaust fan <br /> This is planned as an unheated space, however we would like to add a small baseboard heater. Can we <br /> without triggering a huge engineering effort and high insulation cost. <br /> Thank you for your consideration. <br /> w3" tr <br /> Doug G 'ess <br /> 504 View Ridge Dr <br /> Everett, WA, 98203 <br /> 425-789-1567 <br /> M\o <br />