My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
504 VIEW RIDGE DR 2022-01-13
>
Address Records
>
VIEW RIDGE DR
>
504
>
504 VIEW RIDGE DR 2022-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:13:26 AM
Creation date
1/13/2022 10:11:40 AM
Metadata
Fields
Template:
Address Document
Street Name
VIEW RIDGE DR
Street Number
504
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One question for your energy permit specialist.On a call with him it <br /> appears that we need to insulate to current code, if I remember <br /> correctly. If so could you request that he call me back as furring out <br /> can't be done (not enough space) and rigid foam is prohibitively <br /> expensive:$3k). Instead we planned to insulate with batts that would fit <br /> the existing structure,as well as replace doors and windows. I could go <br /> on but a direct call would be preferable-if he has required us to <br /> insulate "to code". <br /> */ Cheers. Doug <br /> Doug Geniesse <br /> doug@d-geniesse.com <br /> 620-926-1223 <br /> On Feb 12, 2021, at 1:20 PM,Sabrina Good <br /> <SGood(Weverettwa.gov>wrote: <br /> Thank you for your response.We have added the site <br /> plans you submitted to the original permit application <br /> and Alex has signed off.The file has now been passed to <br /> the permit technicians to be worked up for permit <br /> issuance which will likely be a few business days.They <br /> will contact you once approved with instructions for <br /> paying the final permit fees,then issuance once the fees <br /> have been paid.We have discarded the new permit <br /> application and you will be able to apply for that work <br /> in the future when you are getting closer to wanting to <br /> do that work. If you have any questions ahead of future <br /> permit applications, please feel free to reach out to our <br /> staff for guidance on what is required or how to put <br /> your application package together.We have on-duty <br /> reviewers from each discipline most days. Please let me <br /> know if you have any further questions in the <br /> meantime. <br /> Thanks, <br /> <image003.png> <br /> Sabrina Good, P.E. <br /> Permit Services Manager I Permit Services <br /> 425.257.8810,Option 6 13200 Cedar Street, 2nd Floor, <br /> Everett,WA 98201 <br /> Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 <br /> p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& <br /> online resources for updates to our service during <br /> 51r, <br />
The URL can be used to link to this page
Your browser does not support the video tag.