My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4930 VISTA PL 2022-01-13
>
Address Records
>
VISTA PL
>
4930
>
4930 VISTA PL 2022-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 11:01:49 AM
Creation date
1/13/2022 11:01:13 AM
Metadata
Fields
Template:
Address Document
Street Name
VISTA PL
Street Number
4930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> W, C 296-4 <br /> 68-90�� ELECTRICAL ��� REV��lfw <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to (a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> * If item(a)-(ii, iii,or v) is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> ❑ (a) Electrical plan review is not required for: <br /> ❑ (i) Low voltage systems; <br /> 4--0 (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> ❑ does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2; or <br /> (C)A required fire pump system. <br /> ❑ (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A) Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D) Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii) For installations in(a)(ii), (iii),and(v)of this subsection to be considered,the following must be available <br /> —÷❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D) Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> "I occupancies <br /> Electrical plan review is required for all other new or altered electrical projects in educational, institutional,or health care <br /> occupancies defined in this chapter. <br /> ❑ (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-1 Table 900-2 <br /> Health or Personal Care Facilities Educational and institutional Facilities,P€aces of Assembly,or Other Facilities <br /> Health or Personal Care Facility Plan Review Educational,Institutional,or flan Review <br /> Type Required <br /> �� Other Facility Types; Required <br /> Hospital <br /> Nursing i:ome unit or long-term 'Yes <br /> Educationai Yes <br /> care unit in titutional Yes <br /> Boarding home Yes <br /> Assisted living fa it cy Yes <br /> Private aicoholism nospltal Yes Notes to Tables 900-i and 900.2.. <br /> Private p ychiatric hospCet Yes 1.A city authctriZed to do electrical in pettbofts <br /> Maternity home Yes may require plan review on facility types not <br /> Amb giatory surgery facility Yes reviewed by the department. <br /> Renal hemodialysis clinic Yes <br /> Residential treatmeatfacity Yes Enhanced service facility Yes t\61, <br /> 0 i 0(5 <br /> Adult residentia rehabilitation Yes PERMIT# <br /> Page 2-Plan Review <br /> center .•"'"T <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.