Laserfiche WebLink
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: An Ordinance closing a special improvement project entitled “Sewer “O” Utility Upgrades” <br />Fund 336, Program 013, as established by Ordinance No. 3760-20. <br />Council Bill # <br />CB 2201-01 <br />Consideration: Closing Ordinance <br />Project: Sewer “O” Utility Upgrades <br />Partner/Supplier: N/A <br /> Location: South of Pacific Avenue, North of 41st Street <br />Preceding action: Ordinance No. 3760-20, approved 6-17-20 <br />Fund: 336 – Water & Sewer System Improvements Fund <br />Agenda dates requested: <br />1/12, 1/19 and 1/26 agendas <br /> <br />Briefing <br />Proposed action 1/12 and <br />1/19 <br />Consent <br />Action 1/26 <br />Ordinance ( X ) <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Amie Roshak <br /> <br />Phone number: <br />425-257-7249 <br /> <br />Email: <br />aroshak@everettwa.gov <br /> <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The project was completed at a cost of $4,596,391 and a balance transfer to Fund 401 – <br />Water and Sewer Utility Fund in the amount of $1,403,609 for total costs of $6,000,000. <br /> <br /> <br /> <br /> <br /> <br />Project summary statement: <br />Sewer “O” Utility Upgrades project replaced and upsized existing sewers to address pipe <br />condition and capacity issues. The existing sewer mains were over 100 years old. <br />Existing drainage structures in the right-of way were replaced and reconnected to the <br />new main. Cast iron water mains installed in 1958 that were prone to breaks were <br />replaced on Colby Ave between 37th and 40th. Street illumination direct bury wiring <br />and telemetry conduit were also replaced. Restoration included trench patch, half <br />width street pavement overlay of the east side of Colby Ave, ADA curb ramp upgrades at <br />intersections and replacement of sidewalk on both sides of the street. Alleys were <br />repaved full width after trenches were backfilled. <br /> <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance closing a special improvement project entitled “Sewer “O” Utility <br />Upgrades” Fund 336, Program 013, as established by Ordinance No. 3760-20. <br />