1/6/2022 Page 2 13 <br /> 8:46:17AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> 9/3/2021 9/7/2021 MECH 04-ROUGH SDP NO ACCESS (9/7/2021 2:24 PM SDP) <br /> 08:08 SDP 9/7/2021 IN contractor was not on site Scheduled to meet with the contractor to <br /> discuss plumbing and mechanical <br /> corrections and solutions going forward. <br /> Brandon,the contractor,was not on site <br /> when the inspector arrived. <br /> Please reschedule your inspections when <br /> you are ready. <br /> 9/3/2021 9/7/2021 PLUMB SDP NO ACCESS <br /> 08:08 SDP 9/7/2021 03-ROUGH IN contractor was not on site <br /> 9/12/2021 9/13/2021 BLDG KMK NOT READY 9/12/2021 4:34 PM Brandon Agnew <br /> 16:34 EPRS 9/13/2021 08-FRAMING eTRAKiT Inspection Request Afternoon inspection please <br /> Contact Name:Brandon Agnew <br /> Site Address:844 OLYMPIC BLVD <br /> Phone:4252933676 <br /> e-Mail:brandon@agnewhomes.com <br /> (9/13/2021 3:26 PM KMK) <br /> complete plumbing and mechanical rough <br /> in inspections. <br /> Recall for framing inspection when above <br /> has been completed. <br /> 9/13/2021 9/13/2021 MECH 04-ROUGH SDP APPROVAL (9/13/2021 3:17 PM SDP) <br /> 15:13 SDP 9/13/2021 IN see notes Send a photo of the stove exhaust.Remove <br /> the corragated section,only smooth metal <br /> duct allowed. <br /> For final inspection: <br /> 1)Anchor the heat pump <br /> 2)Finish water heater and have manuel on <br /> site <br /> 3)Replace the corragated duct in the garage <br /> with 26 guage. <br /> (9/15/2021 1:41 PM SDP) <br /> Photos have been received and entered into <br /> attachments. <br /> 9/13/2021 9/13/2021 PLUMB SDP APPROVAL (9/13/2021 3:23 PM SDP) <br /> 15:18 SDP 9/13/2021 03-ROUGH IN At final inspection: <br /> 1)Run the T&P line outside seperately, <br /> can't drain into the condensate pump. <br /> 2)Have letter from the owner that they <br /> understand and agree to the alternate plan <br /> of testing the waste,vents and water instead <br /> of removing drywall. <br /> 9/13/2021 9/15/2021 BLDG BDGI APPROVAL 9/13/2021 5:45 PM Brandon Agnew <br /> 17:45 EPRS 9/15/2021 08-FRAMING eTRAKiT Inspection Request Early morning please <br /> Contact Name:Brandon Agnew <br /> Site Address:844 OLYMPIC BLVD <br /> Phone:4252933676 <br /> e-Mail:brandon@agnewhomes.com <br /> 9/27/2021 9/27/2021 PLUMB 07-FINAL SDP OTHER (9/27/2021 1:20 PM SDP) <br /> 13:18 SDP 9/27/2021 letter for final in attachments 2)Have letter from the owner that they <br /> understand and agree to the alternate plan <br /> of testing the waste,vents and water instead <br /> of removing drywall. <br /> As agreed to above the requested letter is in <br /> the attachments. <br /> 10/19/2021 10/20/2021 BLDG KMK APPROVAL 10/19/2021 1:51 PM Brandon Agnew <br /> 13:51 EPRS 10/20/2021 02-FOOTING/SETB eTRAKiT Inspection Request Deck footings.Trying to pour same day if <br /> get early enough inspection. <br /> Contact Name:Brandon Agnew <br /> Site Address:844 OLYMPIC BLVD <br /> Phone:4252933676 <br /> e-Mail:brandon@agnewhomes.com <br /> (10/20/2021 1:38 PM KMK) <br /> Footings for decks OK to pour <br /> INSP_DETAILS <br />