Laserfiche WebLink
4/12/2021 Page 2 / 2 <br /> »e City of Everett <br /> 10:14:49AM <br /> • <br /> INSPECTION ACTIVITY REPORT <br /> 4/9/2021 Any 4/9/2021 AM K 04-SPRINKLER MAW APPRVD-PERIv eTRAKiT Inspection 4/6/2021 12:13 PM Shaina Morgan <br /> FINAL Request Hard-lid cover signed off by Inspector <br /> Russell Jack on 03/22,ACT cover signed <br /> off by Steve Goforth 04/01. <br /> Contact Name:Jared Heit <br /> Site Address:900 PACIFIC AVE <br /> Phone:2536783847 <br /> e-Mail:jared.heit@patriotfire.com <br /> 4/2/2021 8:07 AM Shaina Morgan <br /> Hard-lid Cover signed off w/Inspector <br /> Russell Jack 03/22.ACT Cover signed off <br /> w/Inspector Steve Goforth 04/01. <br /> Contact Name:Jared Heit <br /> Site Address:900 PACIFIC AVE <br /> Phone:2536783847 <br /> e-Mail:shaina.morgan@patriotfire.com <br /> (Canceled-eTRAKiT-4/5/2021 1:23:08 <br /> PM) <br /> (4/8/2021 2:44 PM SAG) <br /> When I inspected they were painting the <br /> area of the hard lids(2 heads). There were <br /> covers on 2 heads because the paint was not <br /> dry yet. Just need to make sure that the <br /> heads are in. <br /> (4/9/2021 10:27 AM MAW) <br /> completed reinspect of two heads. <br /> INSP12 CRWsYsTEMS <br />