My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3506 ROCKEFELLER AVE 2022-01-21
>
Address Records
>
ROCKEFELLER AVE
>
3506
>
3506 ROCKEFELLER AVE 2022-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 8:35:25 AM
Creation date
1/21/2022 8:35:00 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Alterations Worksheet 2015 Washington State Energy Code <br /> Project Information Contact Information <br /> ADE RESIDENCE Home Designs Northwest <br /> 3506 ROCKEFELLER AVE Chris Leonard - (425)402-6053 <br /> EVERETT, WA 98201 chris@homedesignsnw.com <br /> The Washington State Energy Code requirements for alterations are located in Chapter 5 <br /> Alterations (remodels) do not need to obtain energy credits from Table R406.2 <br /> Additions must meet the requirements for new construction. This includes nonconditioned space <br /> being altered to become conditioned space. <br /> Will the wall cavities be exposed? , Yes No <br /> If yes: Exposed wall cavities must be insulated - <br /> 2 X 4 wall studs require R-15 insulation <br /> 2 X 6 wall studs require R-21 insulation <br /> Will the roof/ceiling framing cavities or attic be exposed? Yes No <br /> If yes: Exposed roof/ceiling assemblies must be insulated - <br /> Vaulted ceilings: Insulate to the full depth of fhc framing mcmhcr <br /> while allowing for the minimum 1" ventilated space <br /> Flat ceilings: Install R-49 insulation or what the attic space can <br /> accommodate based on the roof pitch <br /> Will the floor framing cavities be exposed? 0 Yes No <br /> If yes: Exposed floor cavities must be insulated to R-30 <br /> Are the windows and/or doors being replaced? 0 Yes No <br /> (includes both window or door and frames) <br /> If yes: New windows and doors must have an area weighted average U-factor of<_0.30 <br /> Will the heating or cooling system be replaced? 0 Yes No <br /> If yes: New equipment must meet current requirements and <br /> ducts need to be tested <br /> Will the hot water system be altered? Yes No <br /> If yes: New water heating equipment must meet current code requirements <br /> Are more than 50% of the light fixtures being changed? 0 Yes No <br /> If yes: 75% of all lamps must be high efficacy <br /> (LED or CFL) <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.