Laserfiche WebLink
• • <br /> { JUNE 5T", 2020 <br /> DREW MARTIN <br /> ASSOCIATE ENGINEER/COMMERCIAL PLANS EXAMINER <br /> 3200 CEDAR STREET,2ND FLOOR <br /> EVERETT WA 98201 <br /> RE: B2004-017 <br /> 5306 Rockefeller AVE <br /> Dear Drew, <br /> Thank you for your letter and response to our emailed questions. This file contains <br /> • Edited original drawings <br /> • Added Drawings with additional detail <br /> • Added Foundation and Geotechnical Calculations (reviewed,approved and stamped by our structural engineer). <br /> o Exhibit A <br /> o Exhibit <br /> • Exhibits as follows: <br /> o Drawing A—Existing Carport Detail <br /> o Drawing B—Guard Post and Blocking Location Plan View and Steel Channels <br /> o Drawing C—Guard Post Detail <br /> o Drawing D—Post Detail and Eastside Guard Post Detail <br /> o Drawing E—Guard Detail <br /> • Additional Information listed below structured form your Corrections letter: <br /> 1. GEOTECHNICAL <br /> 1.1. See Attached Exhibit A. <br /> 2. STRUCTURAL <br /> 2.1. Referred to Jeff's Letter,which is included below: <br /> 2.1.1. Request to Provide a Plan View of Carport Walls <br /> a. The walls were listed on the plans as"Optional" as their purpose was esthetic only in the plans. <br /> b. We will not be doing any walls on the carport as we want to keep it a carport. <br /> c. This has been removed from the plans as a result. <br /> 2.1.2. Details of the Guard <br /> d. This Guard will be no less than 36 inches in height as measured vertically from a line connecting the <br /> leading edges of the treads. <br /> e. Guard openings will be no larger than 4"from the walking surface to the required guard height <br /> (minimum of 36") <br /> f. The Guard will attach from the side of the deck utilizing prefabricated metal, plastic,or composite, and <br /> attached by the standards outlined by the manufacturer. <br /> g. Detail pages A-A and B-B reflect how the posts will attach to the deck, but in short attached to the inside <br /> face of the rim joists. <br /> 2.1.3. How is the 4x4 guard post located on the south side of the structure closest to the house is attached. <br /> a. See Drawing B. It's not attached to the house. <br /> 2.1.4. Details on the 2 Beams with leaders pointing to them but no description <br /> a. Those are the 2 steel C channels. <br /> b. Drawing is updated with the description—See Drawing B <br /> 2.2. Request for Construction Drawings: <br /> 2.2.1.Attached,see See Drawings B-E <br /> I eL <br />