My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/12/22 Council Minutes
>
Council Minutes
>
2021/12/22 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 9:08:39 AM
Creation date
1/21/2022 9:08:22 AM
Metadata
Fields
Template:
Council Minutes
Date
12/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 22, 2021 <br /> To award the Construction Contract for the 2022 Tulalip Water Pipeline Mortar <br /> Repair Project to Reece Construction in the amount of$1,054,519.20, including <br /> Washington State Sales Tax. <br /> AGREEMENT AMENDED—SCHEMATIC DESIGN SERVICES FOR THE EVERETT <br /> MUNICIPAL BUILDING <br /> To authorize the Mayor to sign Amendment No. 1 to the Professional Services <br /> Agreement with Mackenzie to provide schematic design services for the Everett <br /> Municipal Building— Public Works Tenant Improvement Project. <br /> CALL FOR BIDS—EVERGREEN PUMP STATION UPGRADES PROJECT <br /> To authorize a Call for Bids for the Evergreen Pump Station Upgrades Project. <br /> LICENSE AGREEMENT— MUKILTEO WATER AND WASTEWATER DISTRICT <br /> To authorize the Mayor to sign License Agreement with Mukilteo Water and <br /> Wastewater District. <br /> AGREEMENT AMENDED — DATE OF COMPLETION EXTENSION FOR <br /> ENVIRONMENTAL PERMITTING SUPPORT FOR PUBLIC WORKS <br /> PROJECTS <br /> To authorize the Mayor to Amendment No. 1 to the Professional Services <br /> Agreement Amendment with Wood Environment and Infrastructure Solutions <br /> Inc. extending the date of completion to December 31, 2023. <br /> CONTRACT AWARD—PORT OF EVERETT COMBINED SEWER MAIN PROJECT <br /> To award Construction Contract for construction of the Port of Everett Combined <br /> Sewer Main Project to Northwest Construction, Inc. in the amount of <br /> 4,551,566.85. <br /> Roll was called with all council members voting yes. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.