My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2601 RUCKER AVE 2022-01-21
>
Address Records
>
RUCKER AVE
>
2601
>
2601 RUCKER AVE 2022-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 9:13:11 AM
Creation date
1/21/2022 9:13:06 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2601
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/12/2022 Page 1 <br /> City of Everett 2, <br /> 4:02:31PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2107-028 Site Address 2601 RUCKER AVE <br /> Applied 7/27/2021 Applicant Corey Wenzel Lot <br /> Approved 7/27/2021 Owner WILSON TAE SAN&BYO SIN Block <br /> Issued 7/29/2021 Contractor DAPPER PLUMBING Tract <br /> Parent Permit No. W2105-015 Description Water heater replacement to supply 8 units <br /> Notes Replace 50 gallon water heater with 98 gallon water heater <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 8/4/2021 8/4/2021 PLUMB 07-FINAL TAHU NO ACCESS eTRAKiT Inspection 8/3/2021 3:31 PM DAPPER PLUMBING <br /> Request <br /> Contact Name:DAPPER PLUMBING <br /> Site Address:2601 RUCKER AVE <br /> Phone:3605882227 <br /> e-Mail:coreyw@dapperplumbing.com <br /> (8/4/2021 10:42 AM TAHU) <br /> Talked with owner about access,there was a <br /> miscommunication between contractor and <br /> owner.They were at a funeral <br /> 8/5/2021 8/5/2021 PLUMB 07-FINAL TAHU CORRECTION see notes (8/5/2021 3:08 PM TAHU) <br /> Install a 4" B vent for the hot water tank <br /> (8/9/2021 9:26 AM TAHU) <br /> 1)Please demonstrate how you meet the <br /> one hour rating required on the hot water <br /> tank.The minimum capacity for water <br /> heaters shall be in accordance with the first <br /> hour rating listed in table 501.12(2) In <br /> UPC. <br /> 2) Please demonstrate how you meet <br /> IPMC 505.4.An adequate amont of hot <br /> water shall be drawn at every required sink <br /> ,lavatory,bathtub,shower and laundry <br /> fixture at a minimum temperture of 110'F. <br /> (8/9/2021 9:50 AM TAHU) <br /> Please meet all manufacture's installation <br /> requirements for the hot water tank in the <br /> mechanical room. Please have the <br /> manufacturer's manual for the hot water <br /> tank on site. <br /> INSP12 CRWSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.