Laserfiche WebLink
6/�5/202,1. y City of Everett Page 1/ <br /> 9:41:31AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B2001-039 Site Address 2000 TOWER ST RAINIER HA <br /> Applied 1/24/2020 Applicant MANVI Lot <br /> Approved 3/3/2020 Owner EVERETT COMMUNITY COLLEGE Block <br /> Issued 5/12/2020 Contractor REGENCY NW CONSTRUCTION INC Tract <br /> Parent Permit No. Description MODIFY TOILET ROOMS ON FLOORS 1,2,3 AND MAKE TOIL <br /> Notes ADA COMPLIANT**SEPARATE MECHANICAL,PLUMBING AND ELECTRICAL PERMITS <br /> REQUIRED** <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 8/12/2020 8/13/2020 BLDG KMK OTHER see notes 8/10/2020 11:31 AM Lisa Marcus <br /> 01-CONSULTATIO Please Call Rich Curran @ 208-561-1379 <br /> 3hrs before to allow the architect to be on <br /> site <br /> Contact Name:Rich Curran <br /> Site Address:2000 TOWER ST RAINIER <br /> HA <br /> Phone:2085611379 <br /> e-Mail:Jason.Parrott@regencynw.com <br /> (8/13/2020 3:00 PM KMK) <br /> Ok to use 20 minute doors in corridor in <br /> new construction. <br /> 8/24/2020 8/24/2020 BLDG KMK PARTIAL APPR as noted 8/20/2020 1:53 PM REGENCY NW <br /> 08-FRAMING CONSTRUCTION INC <br /> Contact Name:REGENCY NW <br /> CONSTRUCTION INC <br /> Site Address:2000 TOWER ST RAINIER <br /> HA <br /> Phone:4258831301 <br /> e-Mail:lisa@regencynw.com <br /> (8/24/2020 3:33 PM KMK) <br /> floors 2 and 3 walls only as noted: <br /> Complete all other roughin inspections <br /> before you insulate or cover these areas. <br /> 10/20/2020 10/20/2020 BLDG 12-CEILING BDGI PARTIAL APPR TGrid 2 and 3rd 10/19/2020 6:28 AM Lisa Marcus <br /> GRID floor <br /> Contact Name:Lisa Marcus <br /> Site Address:2000 TOWER ST RAINIER <br /> HA <br /> Phone:4258831301 <br /> e-Mail:lisa@regencynw.com <br /> 10/21/2020 10/21/2020 TEMP KMK CORRECTION See notes (10/21/2020 2:57 PM KMK) <br /> CERTIFICATE OF Contractor is requesting TCO for 3rd floor <br /> usage.Please call for electrical final. <br /> 10/21/2020 10/21/2020 FIRE 02-FINAL BJP PARTIAL APPR see notes (10/21/2020 8:30 AM BJP) <br /> Issued TCO for third floor restroom after <br /> the following conditions were met: <br /> *Hom strobes are in working order <br /> *Smoke detectors are in working order <br /> *Ceiling is covered <br /> INSPl2 CIFWs Y5 TEhis <br />