My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5316 S 4TH AVE 2022-01-21
>
Address Records
>
S 4TH AVE
>
5316
>
5316 S 4TH AVE 2022-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:30:42 AM
Creation date
1/21/2022 11:29:54 AM
Metadata
Fields
Template:
Address Document
Street Name
S 4TH AVE
Street Number
5316
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ted de Budden <br /> From: Jason Maloy <br /> Sent: Tuesday,January 21, 2020 3:00 PM <br /> To: Jeff Heilman;Ted de Budden <br /> Subject: RE: Leese Project- 5316 S.4th Ave <br /> Attachments: Leese -Assessor's Field Notes.pdf; Leese - Original Plumbing Permit.pdf <br /> Good Afternoon Jeff/Ted, <br /> I met out onsite today with the Contractor and David Foster(building inspector). <br /> We showed him all of the corrections that were made to address the code enforcement issues and he seemed to think <br /> that everything looked pretty good. <br /> He also verified that the existing covered attic spaced and bathroom met height requirements for occupancy, but with <br /> the exception that the windows do not meet current egress requirements.That being said, please see the attached <br /> County Assessor's Field Notes and notice that the attic bedroom windows were installed since original construction.This <br /> should mean that they would have met code back when the house was built.Also,the original plumbing permit <br /> application shows 2 toilets(one for each bathroom) which is further proof that the attic bathroom was part of original <br /> construction. <br /> All of this said,we will still need your direction on whether or not any additional corrections are needed in the attic <br /> bathroom. <br /> Please let me know as soon as you are able so I can provide direction to the Contractor on how we are to move forward. <br /> Thank you for your time in reviewing this. <br /> Jason Maloy <br /> Li <br /> City of Everett—Community Housing Improvement Program—C.H.I.P. <br /> Housing Improvement Inspector I Community, Planning, and Economic Development <br /> EVERETT 425.257.7183 12930 Wetmore Ave,Suite 8-b, Everett, WA 98201 <br /> everettwa.gov/CHIP I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From:Jeff Heilman<JHeilman@everettwa.gov> <br /> Sent:Wednesday, October 23,2019 10:58 AM <br /> To:Jason Maloy<JMaloy@everettwa.gov> <br /> Subject: RE: Leese Project-5316 S.4th Ave <br /> Jason, <br /> It appears that your proposal will meet code requirements. Are there any ideas on how to address the front exterior <br /> stairs? I seem to recall there was some sort of issue? <br /> The second floor would need to have the minimum ceiling height per code section 404.3 of the IPMC to be considered <br /> habitable. <br /> I hope this helps. <br /> 1 / I + <br />
The URL can be used to link to this page
Your browser does not support the video tag.