My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9308 9TH DR SE 2022-01-21
>
Address Records
>
9TH DR SE
>
9308
>
9308 9TH DR SE 2022-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 1:24:48 PM
Creation date
1/21/2022 1:24:19 PM
Metadata
Fields
Template:
Address Document
Street Name
9TH DR SE
Street Number
9308
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHWEST <br /> ENGINEERING GROUP <br /> Mr. Chris Towns July 31, 2019 <br /> 9308 9th Dr SE <br /> Everett, WA, •s <br /> Re: Foundation Inspection <br /> Permit Number: B19906-025 <br /> 9308 9th Dr SE <br /> Everett,WA <br /> Dear Mr.Towns, <br /> A pile inspection was performed at your residence on July 3, 2019. The purpose of the pile inspection was <br /> to verify the foundation underpinning work recommended in the Foundation & Elevation Assessment Plan <br /> dated June 12, 2019 had been performed. The inspection was strictly visual and limited to documents <br /> delivered by Ram Jack West. <br /> The underpinning work was reportedly completed by Ram Jack West on July 3, 2019. A total of fourteen <br /> (14) 2 7/8" steel helical piles were installed. Two piles were added in addition to the twelve piles shown in <br /> the Foundation & Elevation Assessment Plan. The location of these piles is shown in the attach As-Built <br /> Plan (SK-1R). <br /> Based on the pile installation log provided,the pile embedment depths ranged from 4 to 5 feet.The reported <br /> installation minimum torque was 4,600 ft-lb, based on this torque and a factor of safety of 2, the allowable <br /> capacity is 20.8 kips which exceeds the 13.3 kips required. The underpinning piles appear to have been <br /> properly installed in accordance with a method typical of the industry. In addition,the piles are lateral braced <br /> in accordance with section 1810.2.2 of the 2015 IBC and compliant with section 1810.2.1 -- <br /> This concludes this report. Observations made in this report pertain to the condition of the residence on the <br /> date of the inspection which is subject to change. No foundation warranty is expressed or implied by this <br /> report other than the warranty provided by the foundation repair contractor. If I can be of further assistance <br /> or should you have any questions about this report, please do not hesitate to contact me. <br /> Sincerely, <br /> ,07 <br /> James Hogan, E.I.T. Darin Willis, P.E. <br /> Engineering Technician Managing Principal <br /> 862 Bethel Drive/ Eugene, OR, 97402/541.393.7363/WWW.NWENGGROUP.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.