My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.4 Conformity with and Deviations From Plans and Stakes 1-28 111 <br /> 1-05.6 Inspection of Work and Materials 1-29 <br /> 1-05.7 Removal of Defective and Unauthorized Work 1-30 <br /> 1-05.10 Guarantees 1-31 <br /> 1-05.11 Final Inspections and Operational Testing 1-32 <br /> 1-05.12 Final Acceptance 1-33 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 1-34 <br /> 1-05.14 Cooperation with Other Contractors 1-34 <br /> 1-05.16 Water and Power 1-36 <br /> 1-05.17 Oral Agreements 1-36 <br /> 1-05.18 Contractor 1-37 <br /> 1-05.19 City-Contractor Coordination 1-39 <br /> 1-06 CONTROL OF MATERIAL 1-40 <br /> 1-06.1 Approval of Materials Prior to Use 1-40 <br /> 1-06.2 Acceptance of Materials 1-41 <br /> 1-06.3 Manufacturer's Certificate of Compliance 1-41ill <br /> 1-06.4 Handling and Storing Materials 1-42 <br /> 1-06.6 Recycled Materials 1-42 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-42 <br /> 1-07.1 Laws to be Observed 1-42 <br /> 1-07.3 Fire Prevention and Merchantable Timber Requirements 1-45 <br /> 1-07.5 Environmental Regulations 1-46 <br /> 1-07.6 Permits and Licenses 1-46 <br /> 1-07.9 Wages 1-47 <br /> 1-07.11 Requirements for Nondiscrimination 1-48 <br /> 1-07.14 Responsibility for Damage 1-49 <br /> 1-07.16 Protection and Restoration of Property 1-51 <br /> 1-07.17 Utilities and Similar Facilities 1-52 <br /> 1-07.18 Insurance 1-54 <br /> 1-07.20 Patented Devices, Materials, and Processes 1-57 <br /> 1-07.23 Public Convenience and Safety 1-57 <br /> 1-07.24 Rights of Way 1-58 <br /> 1-07.27 No Waiver of State's Legal Rights 1-59 <br /> 1-08 PROSECUTION AND PROGRESS 1-59 <br /> 1-08.0 Preliminary Matters 1-60 <br /> 1-08.1 Subcontracting 1-61 <br /> 1-08.3 Progress Schedule 1-62 <br /> 1-08.4 Notice to Proceed and Prosecution of Work 1-67 <br /> 1-08.5 Time for Completion 1-68 <br /> 1-08.6 Suspension of Work 1-70 <br /> 1-08.7 Maintenance During Suspension 1-70 <br /> 1-08.8 Extensions of Time 1-71 <br /> 1-08.9 Liquidated Damages 1-72 <br /> 1-08.10 Termination of Contract 1-73 <br /> 1-08.11 Record Drawings 1-76 <br /> 1-09 MEASUREMENT AND PAYMENT 1-78 <br /> 1-09.1 Measurement of Quantities 1-78 <br /> 1-09.3 Scope of Payment 1-78 <br /> 1-09.4 Equitable Adjustment 1-78 <br /> 1-09.5 Deleted or Terminated Work 1-80 <br /> 1-09.6 Force Account 1-81 <br /> POE Combined Sewer Main Imp. ADVERTISEMENT FOR BIDS October 2021 <br /> Work Order#UP3768 SP-ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.