My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION P— PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> PORT OF EVERETT <br /> COMBINED SEWER MAIN IMPROVEMENTS <br /> WORK ORDER# UP3768 <br /> To the City Council <br /> Everett, Washington <br /> The undersigned Bidder declares that the undersigned has carefully examined the Notice to Contractors <br /> and the Contract Documents (including without limitation Plans and Specifications, Standard <br /> Specifications, Special Provisions, Appendix, Proposal, and Contract) for the construction of <br /> approximately 2,270 linear feet of 42-inch and 2,300 linear feet of 12-inch combined sewer main and <br /> other such Work as may be necessary, in accordance with the Contract. The undersigned Bidder <br /> declares that the Bidder has made such investigations as are necessary to determine the conditions to <br /> be encountered, and that, if this Proposal is accepted, the undersigned will enter into a contract with the <br /> City of Everett, Washington, in the form of Contract hereto annexed, the undersigned will, to the extent <br /> required, provide the necessary equipment, tools, apparatus, and other means of construction, and the <br /> undersigned will furnish all labor and materials necessary to complete the Work in the manner herein <br /> ' specified and according to the requirements of the Engineer. <br /> The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, firm or corporation mentioned below, and no officer or employee of the City of <br /> Everett is personally or financially interested, directly or indirectly, in the Proposal or in any purchase of <br /> or sale of any materials or supplies for the Work to which it relates, or any portion of the profits thereof. <br /> The undersigned Bidder agrees that the undersigned will complete the Work in all respects as required <br /> by Division C, Section 2. Contract Time and that the Bidder will pay liquidated damages to the City in <br /> the amount specified in the Contract Documents. <br /> Accompanying this Proposal is a bid bond or certified check or cashier's check in the amount of five <br /> percent (5%) of the Proposal according to the conditions of the "Notice to Contractors" and "Division 1 - <br /> General Requirements" hereby incorporated. If this Proposal shall be accepted by the City of Everett, <br /> Washington, and the undersigned shall fail to execute a satisfactory contract and bond, as stated in the <br /> Division 1 — General Requirements hereto incorporated, within ***7*** calendar days after the Award <br /> Date, then the City may, at its option, determine that the undersigned has abandoned the Contract and <br /> ' the amount of the bid bond or certified check or cashier's check accompanying this Proposal shall be <br /> forfeited and become the property of the City of Everett, Washington. <br /> I <br /> I <br /> I <br /> I <br /> POE Combined Sewer Main Imp. Division P—PROPOSAL October 2021 <br /> Work Order No.#UP3768 SP— 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.