Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> INote: Unit prices for all items,all extensions, and the total amount bid must be shown. Where conflict occurs between <br /> the unit price and the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform <br /> thereto. All entries must be typed or entered in ink. <br /> i <br /> BID SCHEDULE <br /> IBIDDER: <br /> ItemI No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br /> Schedule A-Combined Sewer Main Improvements <br /> 1 1 Mobilization LS 1 $ . $ <br /> I2 Surveying LS 1 $ _ $ . <br /> 3 SPCC Plan LS 1 $ . $ <br /> I4 Force Account FA 100,000 $ 1.00 100 000.00 <br /> Removal of Structures and <br /> 5 Obstructions TON 100 $ _ $ <br /> Structure Excavation and Stockpiling, <br /> 6 Incl. Haul CY 14,900 $ _ $ <br /> I Clean Fill and Native Exc., Backfill,7 and Compaction, Incl. Haul CY 3,200 $ — <br /> $ <br /> I 8 Select Borrow, Incl. Haul TON 17,710 $ _ $ <br /> Gravel Backfill for Pipe Zone Bedding, <br /> 9 Incl. Haul TON 9,110 $ _ $ <br /> I Remove Unsuitable Pipe Foundation <br /> 10 Material CY 500 $ — $ <br /> Replace Unsuitable Pipe Foundation <br /> I 11 Material TON 900 $ _ $ <br /> Disposal of Inert Fill and Debris, <br /> 12 Including Haul CY 14,600 $ _ $ <br /> 13 Special Industrial Waste TON 450 $ _ $ <br /> I14 Hazardous Waste Disposal FA 50,000 $ 1.00 $ 50,000.00 <br /> 15 Health and Safety Plan LS 1 $ . $ <br /> I16 Gravel Pad Construction SY 1,350 . <br /> I <br /> I <br /> POE Combined Sewer Main Imp. Division P—PROPOSAL October 2021 <br /> iWork Order No.#UP3768 SP— 5 <br />