My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> Item ITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT <br /> QtY <br /> I17 Trench Cutoff Wall EA 1 $ _ $ <br /> 18 Decommission Monitoring Well EA 5 $ . $ <br /> I19 Manhole 72-In. Diam. Type 3 EA 6 $ $ . <br /> I20 Air Vacuum Valve Assembly, 2-In. EA 1 $ _ $ . <br /> 21 Trench Excavation Safety Systems LS 1 $ _ $ <br /> I22 PVC Sanitary Sewer Pipe, 12 In. Diam. LF 2,300 $ _ $ <br /> I23 FRPP Sanitary Sewer Pipe, 42 In. Diam. LF 2,270 $ _ $ . <br /> 24 Temporary Bypass Pumping LS 1 $ . $ <br /> I25 Trench Dewatering LS 1 $ $ <br /> I26 Temporary Erosion and Sediment Control Plan LS 1 $ _ $ . <br /> 27 Erosion and Sediment Control Lead LS 1 $ _ $ . <br /> I28 Erosion/Water Pollution Control FA 21,000 $ 1.00 $ 21,000.00 <br /> I29 Chain Link Fence—6 Ft. Tall LF 50 $ . $ <br /> 30 Baseline COVID-19 Requirements LS 1 $ _ $ . <br /> ISchedule A <br /> IWA State Sales Tax @ 9.8% $ <br /> Total Bid Amount $ <br /> IThe bid items above are described further in Division B— Bid Items Descriptions. <br /> I <br /> I <br /> I <br /> POE Combined Sewer Main Imp. Division P—PROPOSAL October 2021 <br /> iWork Order No.#UP3768 SP— 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.