Laserfiche WebLink
I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> I SUBCONTRACTORS FORM <br /> 1. For heating,ventaton,arconditioning,plumbing(as defined by RCW Chap. 18.106)and electrical <br /> work(as defined by RCW Chap. 19.28),and structural steel installation and rebar installation,Bidder <br /> I <br /> MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not <br /> part of the scope of Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> Subcontractors vary with bid alternates,in which case the Bidder must indicate which Subcontractor <br /> Iwill be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> ' A. For heating,ventilation,air conditioning,plumbing,electrical,structural steel installation and <br /> rebar installation, Bidder fails (1) to submit as part of the Bid the names of such <br /> Subcontractors, (2)to name itself to perform such Work,or(3)to write"No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> I 4. The requirement to name the Bidder's proposed heating,ventilation and air conditioning,plumbing, <br /> electrical, structural steel installation and rebar installation subcontractors applies only to proposed <br /> heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar <br /> ' installation subcontractors who will contract directly with the general contractor submitting the Bid <br /> to the City. Q ical <br /> 5. The heating, ventilation and air conditioning, plumbmg, electr portions of the chart below must <br /> I 6. <br /> be submitted with the bid proposal or within one hour of the published bid submittal time. <br /> The structural steel installation and rebar installation portions of the chart below must be submitted <br /> with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> Type/Scope of Work <br /> Name and Address of Subcontractor/Or Bidder <br /> HEATING <br /> I Subcontractor,bidder or"no work"MUST be � ` <br /> stated t tv t & <br /> VENTILATION AND AIR CONDITIONING <br /> I <br /> Subcontractor,bidder or"no work"MUST be � l '^ <br /> stated i C 3cD —V_ <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> I <br /> Subcontractor,bidder or"no work"MUST be <br /> stated ram-'c,P kC <br /> ELECTRICAL (as described in RCW Chap. 19.28) �(�(1 k t l� <br /> Subcontractor,bidder or"no work"MUST be stated i r ,iZ\.c_ S <br /> I <br /> STRUCTURAL S I'EEL INSTALLATION <br /> Subcontractor,bidder or"no work"MUST bed t ��� <br /> stated <br /> I REBAR INSTALLATION <br /> Subcontractor,bidder or"no work"MUST be <br /> 1. <br /> stated �J <br /> I <br /> I <br /> I <br /> POE Combined Sewer Main Imp. <br /> Division P—PROPOSAL October 2021 <br /> I <br /> Work Order No.#UP3768 SP— 11 <br /> . ., ., .,..._,_..,._ -F Tan r.,- Vnr usaae Conditions Agreement see www.bxwa.com - Always Verify Scal <br />