My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract delivered <br /> in person or by certified mail to the Bidder whose Bid is accepted, together with a request to <br /> furnish a Contract Bond and evidence of insurance and to execute the Contract set forth in <br /> the Contract Documents. No Contract is formed until the Contract Execution Date. <br /> II-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> Successful Bidder has **7** calendar days after receiving the Notice of Award to submit the <br /> following documents to the City: <br /> • Two executed copies of the Contract. <br /> • Two original payment bonds and two original performance bonds submitted on <br /> forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement in accordance with <br /> 1-07.18 "Insurance" of the Special Provisions. <br /> Revise the third paragraph of 1-03.3 to read as follows: <br /> If the Bidder experiences circumstances beyond their control that prevents return of the <br /> Contract Documents within**7**-calendar days after the Award Date, the City may grant more <br /> time for return of the documents, provided the City deems the circumstances warrant it. <br /> Supplement 1-03.3 by adding the following: <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> Revise 1-03.4 to read as follows: <br /> The Contractor shall provide a separate payment bond and performance bond, each in the <br /> amount of 100 percent of the Contract Sum and each in the form contained in the Contract <br /> Documents. These bonds shall serve as security for the faithful performance of the Work <br /> and as security for the faithful payment and satisfaction of the persons furnishing materials <br /> and performing labor on the Work. The bonds shall be issued by a corporation duly and <br /> legally licensed to transact surety business in the State of Washington. Such bonds shall <br /> remain in force throughout the period required to complete the Work, and thereafter for a <br /> period of 365 calendar days after Final Acceptance. The bonds must be executed by a duly <br /> licensed surety company, which is listed in the latest Circular 570 of the United States <br /> Treasury Department, as being acceptable as surety on federal bonds. No surety's liability <br /> on the bond shall exceed the underwriting limitations for the respective surety specified in <br /> Circular 570. The bonds must be signed by an officer of the Contractor empowered to sign <br /> binding instruments. The bonds must be accompanied by a fully executed and original <br /> power of attorney for the officer executing on behalf of the surety. The scope of the bonds <br /> or the form thereof prescribed in these Contract Documents shall in no way affect or alter <br /> the liabilities of the Contractor to the City as set forth in the Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a City of <br /> Everett business license prior to executing the Contract, unless immediately cured by Bidder <br /> after notice from the City, shall result in forfeiture of the proposal bond or deposit of this Bidder. <br /> I <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> ' Work Order#UP3768 SP 1-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.