My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6101 23RD DR W RTS MILLWORK 2022-01-21
>
Address Records
>
23RD DR W
>
6101
>
RTS MILLWORK
>
6101 23RD DR W RTS MILLWORK 2022-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 4:05:07 PM
Creation date
1/21/2022 4:05:00 PM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6101
Tenant Name
RTS MILLWORK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/5/2020 City of Everett Page 1 <br /> 7:32:15AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2008-080 Site Address 6101 23RD DR W <br /> Applied 8/14/2020 Applicant VALLEY ELEC CO OF MTVERNON INC Lot <br /> Approved 8/14/2020 Owner LANDBUILD LLC Block <br /> Issued 8/17/2020 Contractor VALLEY ELEC CO OF MTVERNON INC Tract <br /> Parent Permit No. -- Description RTS Everett Power Upgrades <br /> Notes Upgraded Service/Feeder,add equipment connections and receptacles <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 9/3/2020 9/3/2020 ELEC 05-SERVICE SKB CORRECTION eTRAKiT Inspection 8/31/2020 11:53 AM VALLEY ELEC CO <br /> Request OF MTVERNON INC <br /> Contact Name:VALLEY ELEC CO OF <br /> MTVERNON INC <br /> Site Address:6101 23RD DR W <br /> Phone:4252384459 <br /> e-Mail:mattk@velectric.com <br /> (9/3/2020 4:24 PM SKB) <br /> Install fuse rejecter clips as the service is <br /> over 50,000 AIC remark service as it is hard <br /> to read.Grounding electrode conductor <br /> must land on the grounded bus.Bond the <br /> third gas pipe. <br /> 9/29/2020 9/29/2020 ELEC 05-SERVICE MCB APPROVAL eTRAKiT Inspection 9/23/2020 1:23 PM VALLEY ELEC CO OF <br /> Request MTVERNON INC <br /> Contact Name:VALLEY ELEC CO OF <br /> MTVERNON INC <br /> Site Address:6101 23RD DR W <br /> Phone:4252384459 <br /> e-Mail:anthonyh@velectric.com <br /> (9/29/2020 3:59 PM MCB) <br /> Ok service and transformer <br /> 10/12/2020 10/12/2020 ELEC 06-ROUGH SKB APPROVAL eTRAKiT Inspection 10/8/2020 1:39 PM VALLEY ELEC CO OF <br /> IN Request MTVERNON INC <br /> Contact Name:VALLEY ELEC CO OF <br /> MTVERNON INC <br /> Site Address:6101 23RD DR W <br /> Phone:4252384459 <br /> e-Mail:Anthonyh@velectric.com <br /> (10/12/2020 4:15 PM SKB) <br /> 200.Amp feeder to existing 200 amp <br /> 480volt panel 100 amp feeder to new 480V <br /> panel to step down transformer to 208 volt <br /> panel. <br /> 11/4/2020 11/4/2020 ELEC 09-FINAL MCB APPRVD-PERN eTRAKiT Inspection 11/3/2020 9:54 AM VALLEY ELEC CO <br /> Request OF MTVERNON INC <br /> Afternoon preferred.Will call in the <br /> morning to confirm. <br /> Contact Name:Joe Knabe <br /> Site Address:6101 23RD DR W <br /> Phone:2067304404 <br /> e-Mail:mattk@velectric.com <br /> INSPl2 CRWsYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.