My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 23RD DR W BASE FILE 2022-03-03
>
Address Records
>
23RD DR W
>
6200
>
BASE FILE
>
6200 23RD DR W BASE FILE 2022-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2022 2:34:17 PM
Creation date
1/24/2022 8:30:30 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6200
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> LANCE MUELLER & ASSOCIATES <br /> Limm/ */\/\ <br /> A R CHIT E C TS • AIA <br /> June 16, 2021 D E <br /> © OVL \ <br /> Everett Permit Services R JUN 1 7 2021 1'9 <br /> 3200 Cedar Street, 2nd floor CITY OF EVERETT <br /> Everett, WA 98201 Permit Services <br /> Re: Suite 101, Seaway Industrial <br /> 6200 23rd Dr. W <br /> Everett, WA 98203 <br /> (Permit# B2102-032) <br /> Dear permit technician, <br /> We inquired who the permit plans examiner was for this tenant improvement. We were told Alex <br /> Bryd so that is who is indicated on the attached revision form. <br /> The set we have permitted under permit# B2102-032 has some requested revisions by the building <br /> owner. We have created a list of the revisions to the previously permitted drawings for your review <br /> below. All revisions have been clouded and have revision delta number 1. <br /> Sheet TA1.0: The hatched area indicating area of work has been modified on the site plan. <br /> Sheet TA1.1: Additional walls and ceilings to be demolished are shown on 16/TA1.1. <br /> Sheet TA2.0: The Overall Floor Plan 16/TA2.0 has been modified to show added and demolished <br /> walls. Wall Type C and D have been added to this sheet. <br /> Sheet TA2.1: The Enlarged Floor Plan 16/TA2.1 has been modified to show 4 added offices, an <br /> added vestibule, a conference room, and a room TBD. Toilet Rooms 107 and 108 have been <br /> changed to Men's toilets to replace the Men's toilet room being demolished. The drinking fountains <br /> have been relocated to allow for Hall 106. An existing Toilet Room 115 has been added to the plan. <br /> Sheet TA2.2: This is an added sheet with the Reflected Ceiling Plan and the Suspended Ceiling <br /> Details. <br /> Sheet TA3.0: This is an added sheet with the Room Finish and Door schedules. Detail 30/TA3.0 is <br /> for the interior non-bearing partition connections. <br /> 130 Lakeside • Suite 250 • Seattle,WA 98122 • (206)325-2553 • Fax (206)328-0554 <br /> Architecture Planning Space Planning Interiors <br /> fd <br />
The URL can be used to link to this page
Your browser does not support the video tag.