Laserfiche WebLink
1505 Westlake Ave N , Phone: (206) 336-2863 <br /> • <br /> Crow.* O Seattle,WA 98109 Fax: <br /> CAST 1 E www.crowncastle.com <br /> • (2)Site Plans <br /> • (2)Construction Drawings <br /> Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum <br /> Act"(Pub.Law No.112-96, 126 Stat 156),mandates that state and local governments"may not deny,and shall <br /> approve,any eligible facilities request for a modification of an existing wireless tower or base station that does not <br /> substantially change the physical dimensions of such tower or base station." Additionally,if"the reviewing State <br /> or local government determines that the application is incomplete" [they]"must provide written notice to the <br /> applicant within 3o days of receipt of the application,clearly and specifically delineating all missing documents or <br /> information." Under federal law,an Eligible Facilities Request is deemed granted with written notification in sixty <br /> (6o)days after an application is filed with a local jurisdiction,excluding tolling. <br /> Verizon is committed to working cooperatively with all jurisdictions around the country to secure expeditious <br /> approval of requests to modify existing personal wireless service facilities. If you should require more information <br /> regarding the Spectrum Act,please do not hesitate to contact me with your questions. <br /> Sincerely, <br /> Renata Fayten <br /> For CCI on behalf of Verizon <br /> 425-269-5561 <br /> The Foundation for a Wireless World. <br /> CrownCastte.com <br /> r2dI <br />