My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2408 39TH ST VERIZON ANTENNA 2022-01-24
>
Address Records
>
39TH ST
>
2408
>
VERIZON ANTENNA
>
2408 39TH ST VERIZON ANTENNA 2022-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 9:35:40 AM
Creation date
1/24/2022 9:34:31 AM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
2408
Tenant Name
VERIZON ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pc..i.7,,. <br /> *` ste <br /> B+TGRP <br /> ,e. 2 4 <br /> Date: March 20,2021 el 40/0 <br /> Ae®z, 3?®2f B+T Group <br /> /,,, 1'I 1717 S. Boulder, Suite 300 <br /> Sipa�PI'/ z., Tulsa, OK 7411 <br /> C� '?'), (918) 587-4630 9 <br /> es <br /> Subject: Structural Analysis Report <br /> Carrier Designation: Verizon Wireless Co-Locate 0 <br /> Site Number: 298643 <br /> Site Name: Wide_Stream Q <br /> Crown Castle Designation: BU Number: 815285 CAk �� <br /> 0 <br /> Site Name: LOWELL e O o <br /> JDE Job Number: 631025 'k ? <br /> Work Order Number: 1934130s,G4 ��I e) <br /> Order Number: 540573 Rev. 0 42 <br /> Engineering Firm Designation: B+T Group Project Number: 85660.013.01 <br /> Site Data: 2408 39th St., Everett,Snohomish County,WA <br /> Latitude 47°57'56.28", Longitude-122°11'44.25" <br /> 130 Foot-Monopole Tower <br /> B+T Group is pleased to submit this "Structural Analysis Report" to determine the structural integrity of the <br /> above-mentioned tower. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br /> have determined the tower stress level for the structure and foundation, under the following load case, to be: <br /> LC7: Proposed Equipment Configuration Sufficient Capacity <br /> This analysis has been performed in accordance with the 2018 International Building Code based upon an <br /> ultimate 3-second gust wind speed of 98 mph. Applicable Standard references and design criteria are listed in <br /> Section 2-Analysis Criteria. <br /> Structural analysis prepared by: Jacob Johnson, E.1.T. <br /> Respectfully submitted by: B+T Engineering, Inc. <br /> COA: 3425; Expires: 12/31/2021 <br /> IiiiVTON k <br /> .`�of wAsyficll� <br /> tUR i ' <br /> k0V tip <br /> SIONAL <br /> 1 4 <br /> re/ <br /> 7j <br /> John W. Kelly, P.E., S.E. <br /> tnxTower Report-version 8.0.7.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.