Laserfiche WebLink
) 1 I 2 I 3 I 4 I 5 <br /> O C5) 0 (3) 0 0 0 O 0 0 0 0 <br /> 0 Sw1 0 SW1 0 sw1 0 (--A---) ( 1j <br /> sw1 <br /> DS RASHERSAYER O : 0 0V SW2 SW2V SW2 <br /> SUNDRY/WC _ _ "J SLAB ON-GRADE - -.. I U <br /> D b ❑ - A.1 D <br /> FAMILY ! SW2 <br /> 47 <br /> r- <br /> I SCW1 <br /> 0 L_-_ ___._.__ V LOCATIONS OF <br /> L g -' - - ------ , I SIMPSON #HITS HOLDOWNS <br /> ROOM = • _ SW2 <br /> LIVING <br /> 1- <br /> O 1 � I � , 1a O _ <br /> _ KITCHEN DINING 6.1 � 6.1 <br /> _ ! -_ I <br /> sw1 r <br /> D 1 <br /> O rvcE A O PROVIDE 5/8" x 10-1/2" 0 <br /> WASHER HEW 1I 1 SW1 SD -- 1 ALL THHROUGH° TR BOLTS PTHEDPERIAIETEA:_j_-- ❑ ❑ 6.2 <br /> C A ^ ® O 0 O C <br /> swi 1 <br /> !1 <br /> 6 5 4 E3 00 © J 0 <br /> SHEAR WALL ANCHOR & HOLD DOWN SW2A p SW2 <br /> LOCATIONS - 1ST & 2ND FLOOR <br /> SCALE : NTS <br /> 0 0 0 0 o O <br /> SHEARWALL NOTES: HOLDOWN NOTES: SHEAR WALL ANCHOR & HOLD DOWN <br /> 1. INSTALL PANELS VERTICALLY. DO NOT BREAK AT RIM UNLESS STRUCTURAL RIM JOIST. 1. PROVIDE SIMPSON #HTT5 HOLDOWN. USE (26) 0.162x3 FASTENERS. <br /> 2. WHRE SHEATING IS APPLIED ON BOTH SIDES OF WALL, PANEL EDGE JOINTS ON 4X 2. INSTALL ALL SHEAR ANCHORS PER MANUFACTURER'S INSTRUCTIONS. LOCATIONS - BASEMENT <br /> FRAMING SHALL BE STAGGERED SO JOINTS ON THE OPPOSITE SIDES ARE NOT LOCATED 3. ALL METAL CONNECTORS COMING IN CONTACT WITH PRESSURE TREATED WSTHDOOD <br /> ON THE SAME STUDS. SHALL BE SIMPSON "Z-MAX', TRIPLE ZINC COATED, OR HOT DIPPED GALVANIZED FOR <br /> 3. BLOCKING IS REQUIRED AT ALL PANEL EDGES. SCALE NTS u <br /> 4. PROVIDE SHEARWALL SHEATING AND NAILING FOR THE ENTIRE LENGTH OF THE WALLS CORROSION PROTECTION. <br /> INDICATED ON THE PLANS. ENDS OF FULL HEIGHT WALLS ARE DESIGNATED BY EXTERIOR 4. SUBSTITUTION WITH NON-SIMPSON ANCHORS WITH ENGINEER'S APPROVAL. <br /> OF THE BUILDING, CORRIDORS, WINDOWS, OR DOORWAYS OR AS DESIGANTED ON THE 5. STHDI4RJ INSTALLATION AT RIM JOIST LOCATIONS ONLY (RJ=RIM JOIST). <br /> PLANS. SEE PLANS FOR HOLDOWN REQUIREMENTS. <br /> 5. SHEATING EDGE NAILING IS REQUIRED AT ALL HOLDOWN POSTS. <br /> B 6. INTERMEDIATE FRAMING TO BE WITH 2X MINIMUM MEMBERS. FIELD NAILING IS 12" O.C. SHEARWALL/ANCHOR SCHEDULE B <br /> UNLESS NOTED OTHERWISE. <br /> 7. BASED ON Q.131"x1-1/2" LONG NAILS USED TO ATTACHED FRAMING CLIPS DIRECTLY 2X BOTTOM <br /> TO FRAMING. USE 0.131"x2-1/2" LONG NAILS WHEN NAILING THROUGH SHEATING. USE PLATE &TOP <br /> A35 OR RBC CLIPS IN LIEU OF LTP'S FOR ROOF BLOCKING TO TOP PLATE. PLATE SILL PLATE ATTACHMENT <br /> 8. 16d @ 4" O.C. TYPICAL UNLESS NOTED OTHERWISE. APA RATED NAIL SIZE& STUD AND RIM JOIST OR <br /> 9. WHERE PLATE ATTACHMENTS SPECIFY (2) ROWS OF NAILS, PROVIDE DOUBLE JOIST. RIM BLOCKING SIZE @ BLOCK ATTACHMENT CAPACITY(PLF) "_ <br /> LABEL SHEATING(1)(2) SPACE @ EDGES <br /> OR EQUAL ATTACH PER DETAILS. ADJOINING EDGES CONNECTION TO ANCHOR BOLT TO SEISMICIWIND i_ <br /> 10. ANCHOR BOLTS SHALL BE PROVIDED WITH STEEL PLATE WASHERS 1/4"x3"X3", EMBED (4)(14)(21) (4)(5) PLACEMENT OF �� <br /> ANCHORS A MINIMUM OF 7" INTO THE CONCRETE. MAX 1/2" FROM SHEATING SIDE. (3)(6)(15)(16) TOP PLATE(7)(8) NAILING TO WOOD CONCRETE EDGE OF PLATELets <br /> 11. PRESSURE TREATED MATERIALS CAN CAUSE EXCESSIVE CORROSION IN THE FASTENERS. BELOW(9) BELOW(10)(20) "�PROVIDE HOT-DIPPED GALVANIZED (ELECTROPLATING NOT PERMITTED) NAILS AND (22) WASHER(19) � Hwy - <br /> CONNECTOR PLATES (FRAMING ANGLES. ETC.) FOR ALL CONNECTORS IN CONTACT WITH 4 112 WASHER <br /> PRESSURE TREATED FRAMING MEMBERS. 16d @ 6"OC+ <br /> 12. USE HRS8 TO CONNECT SECOND FLOOR TO ROOFING SYSTEM SPACED @ EVERY OTHER 19132CDX REQUIRED+ 4112"WASHER <br /> STUDS. SW1 (ONE SIDE) 10d @ 6"O.C. 2X 16d @ 4"O.0 HTP37Z @EACH HTP37Z AT EACH REQUIRED 240/335 HTT5 TYPICAL <br /> 13. 19/32" PLYWOOD SHEATING SHALL BE USED @16" O.C. SPACING MAX. STUD STUD DETAIL <br /> 14. WHERE WOOD SHEATHING (W) IS APPLIED OVER GYPSUM SHEATHING (G) CONTACT THE <br /> ENGINEER OF RECORD FOR ALTERNATE NAILING REQUIREMENTS. <br /> 15. AT ADJOINING PANEL EDGES, (2) 2X STUDS NAILED TOGETHER MAY BE USED TOGETHER 16d @ 6"OC& <br /> IN PLACE OF A SINGLE 3X STUD. DOUBLE 2X STUDS MAY BE CONNECTED TOGETHER 19132 CDX 518"@ 36"O.C.,112" 4112"WASHER <br /> BY NAILING WITH 3" LONG NAILS SPACED CONSISTENTLY WITH PLATE NAILING. SW(BOTH SIDES) 10d @ 3"O.C. 4X LTP4 @ 4"O.0 HTP37Z @EACH @ 8"O.C. REQUIRED 900N460 <br /> 16. CONTACT THE ENGINEER OF RECORD FOR ADHESIVE OR EXPANSION BOLT ALTERNATIVES STUD <br /> A TO CAST IN PLACE ANCHOR BOLTS. (INSPECTION MAY BE REQUIRED). A <br /> 17. ALL EXTERIOR SHEATING ARE 19/32" PLYWOOD (CDX). <br /> 18. SIMPSON STRAP TIES ST6224 SHALL BE USED TO CONNECT BASEMENT TO FIRST FLOOR <br /> & FIRST FLOOR TO SECOND FLOOR SPACED © EVERY 3 STUDS. PREPARED BY: 1\C BINc.I, PROJECT TITLE : OWNER: REVISIONS DRAWING NO. <br /> 19. EDGE OF PLATE WASHER A MAXIMUM OF 1/2" FROM THE SHEATHED SIDE OF THE y,c° es wesyr'to STRUCTURAL&ELECTRICAL SYM DESCRIPTION DATE APPROVED <br /> SHEAR WALL. TRIPLE V CONSULTANTS ���s�` C1�t� RENOVATION MR. SAI SHANKAR <br /> 20. USE 5/8" GWB FOR SW5 WHERE SPECIFIED BY DESIGNER. (Bremerton and Whidbey Island,WA) S-1 O8 <br /> 21. NOT USED. Triplevconsultants@msn.com SHEET TITLE 2222 BAKER AVENUE <br /> 22. SIMPSON MASAP (STANDARD INSTALLATION) MAY BE SUBSTITUTED FOR ANCHOR BOLT. BT++$o EVERETT,WA 98201 SCALE: AS INDICATED <br /> USE 1/2"AB SPACING. 360-632-2913 �oxn1 SHEAR WALL ANCHORS AND <br /> HOLDOWN PLANS s- <br /> H oP <br /> I EXPIRES: I _ <br /> 1 1 2 I 3 I 4 I 5 /,;9 <br />