Laserfiche WebLink
11/8/2021 Page 1 <br /> City of Everett <br /> 1:42:37PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2010-027 Site Address 3202 51ST PL SW <br /> Applied 10/22/2020 Applicant Zach Miller Lot <br /> Approved 6/24/2021 Owner Luis and Allison Albertson Block <br /> Issued 6/30/2021 Contractor KNOCKOUT PLUMBING&MECH LLC Tract <br /> Parent Permit No. BW2011-005 Description Basement remodel,adding kitchen and bathroom <br /> Notes will require relocating of piping <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> PLUMB 07-FINAL MPI eTRAKiT Inspection 11/1/2021 5:13 PM KNOCKOUT <br /> Request PLUMBING&MECH LLC <br /> Contact Name:Knockitout <br /> Site Address:3202 51ST PL SW <br /> Phone:2068582211 <br /> e-Mail: <br /> billing@knockoutplumbingseattle.com <br /> 7/2/2021 7/2/2021 PLUMB SDP APPROVAL eTRAKiT Inspection 6/30/2021 1:57 PM KNOCKOUT <br /> 03-ROUGH IN Request PLUMBING&MECH LLC <br /> Contact Name:ZACH MILLER <br /> Site Address:3202 51ST PL SW <br /> Phone:2067798309 <br /> e-Mail: <br /> billing@knockoutplumbingseattle.com <br /> 11/4/2021 11/5/2021 PLUMB 07-FINAL JJM APPRVD-PERT eTRAKiT Inspection 11/1/2021 5:08 PM KNOCKOUT <br /> Request PLUMBING&MECH LLC <br /> If there is any sooner availability please let <br /> us know.We are in desperate need to get <br /> this done. <br /> Contact Name:KNOCKOUT PLUMBING <br /> &MECH LLC <br /> Site Address:3202 51ST PL SW <br /> Phone:2068582211 <br /> e-Mail: <br /> billing@knockoutplumbingseattle.com <br /> (11/4/2021 11:57 AM JJM) <br /> -Need mixing valve installed for claw foot <br /> soaking tub. <br /> -Caulk toilet to floor and around kitchen <br /> sink. <br /> INSP12 CRWSYSTEMS <br />