My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 DORN AVE 2022-01-24
>
Address Records
>
DORN AVE
>
215
>
215 DORN AVE 2022-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:21:27 AM
Creation date
1/24/2022 11:15:29 AM
Metadata
Fields
Template:
Address Document
Street Name
DORN AVE
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All temporary erosion and sediment control BMPs shall be removed within 30 days after the <br /> final site stabilization is achieved or after the temporary BMPs are no longer needed.Trapped <br /> sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs <br /> or vegetation shall be permanently stabilized. <br /> Element#12—Manage the Project <br /> Erosion and sediment control BMPs for this project have been designed based on the following <br /> principles: <br /> • Design the project to fit the existing topography, soils, and drainage patterns. <br /> • Emphasize erosion control rather than sediment control. <br /> • Minimize the extent and duration of the area exposed. <br /> • Keep runoff velocities low. <br /> • Retain sediment on site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> Element#13—Protection of Lid BMP's <br /> During the construction of the EFI Properties project all proposed BMP's on-site shall fully <br /> comply with the DOE's regulations for Element#13. High visibility fence is to be installed in the <br /> location of the bioretention facility locations. Protect bioretention BMP from sedimentation <br /> through installation and maintenance of erosion and sediment control BMPs on portions of the <br /> site that drain into the bioretention BMP. Restore the BMP to their fully functioning condition if <br /> they accumulate sediment during construction. Restoring the BMP must include removal of <br /> sediment and any sediment-laden bioretention soils, and replacing the removed soils with soils <br /> meeting the design specification. Prevent compacting bioretention BMP by excluding <br /> construction equipment and foot traffic. Protect completed lawn and landscaped areas from <br /> compaction due to construction equipment. Keep all heavy equipment off existing soils under <br /> LID facilities that have been excavated to final grade to retain the infiltration rate of the soils. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.