My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 DORN AVE AB 2022-01-24
>
Address Records
>
DORN AVE
>
215
>
215 DORN AVE AB 2022-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:34:07 AM
Creation date
1/24/2022 11:33:38 AM
Metadata
Fields
Template:
Address Document
Street Name
DORN AVE
Street Number
215
Unit
AB
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . <br /> 2019 System Development Fee Calculations <br /> Permit#:C1803-004 GAP, L Additional Notes: <br /> Project Address:215 DORN AVE B `(,(��►-/t-ASr)Irta, C VieGl) <br /> Project Name: ,/ J <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: BENYAM STEPHANOS Date: <br /> Outside City Limits? *Adds a 25%Surcharge ,Job'/ <br /> Supportive Housing Credit? *Reduces by 80% _Reviewed By: / v J Date: W I 1 <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: Duplex Previous Bldg Use#1: Previous Bldg Use#2: Previous Bldg Use#3: <br /> ProposedUnit Measure: 2 Unit Unit Measure for Use#1: YES #N/A Unit Measure for Use#2: NO #N/A Unit Measure for Use#3: NO #N/A <br /> Note:Meter Size Used for Proposed Meter Size: 3/4" Credited Meter#1 Size: 3/4" Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $3,957.00 Water Credit#1: Wa Water Credit#3: $0.00 <br /> Sewer Fee: $5,121.00 Sewer Credit#1: Sea :wer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> Total: $0.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: 3/4" Credited Meter Size: 3/4" <br /> Water Fee: $3,957.00 Water Credit: n57.o0 <br /> No Sewer Fee: $0.00 No Sewer Credit: <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> C1803-004 Type of Construction: New Construction/Redevelopment <br /> Square Feet of New Plus Replaced Hard Surfaces: - SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.