Laserfiche WebLink
2021 Stormwater System Development Fee Calculations <br /> Permit#: B2107-013 Additional Notes: <br /> Project Address: 1525 75th St SW Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs ��(j <br /> Water District: •Everett ns <br /> "'1d I 2 <br /> Sewer District: _Everett Prepared By: Date: 8/6/2021 <br /> Outside City Limits? No *Adds a 25%Surcharge / <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: �' Date: ! 1.-c-N7_i <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2107-013 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 464 SF • <br /> Stormwater System Dev Fee: $122.17 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br /> • <br />