My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1615 75TH ST SW HOME HEALTH AND HOSPICE 2022-01-24
>
Address Records
>
75TH ST SW
>
1615
>
HOME HEALTH AND HOSPICE
>
1615 75TH ST SW HOME HEALTH AND HOSPICE 2022-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 1:27:27 PM
Creation date
1/24/2022 1:26:59 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1615
Tenant Name
HOME HEALTH AND HOSPICE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/13/2021 Page 1 <br /> City of Everett <br /> 6:31:29AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B2103-068 Site Address 1615 75TH ST SW STE 200 <br /> Applied 3/23/2021 Applicant JOHN R LEUCK Lot <br /> Approved 5/21/2021 Owner SABEY CORP Block <br /> Issued 7/15/2021 Contractor HUTCH CON CONSTRUCTION INC Tract <br /> Parent Permit No. Description TENANT IMPROV FOR NEW WORK SPACE-HOME HEALTH <br /> Notes NO STRUCTURAL OR EXTIOR WORK,ALL INTERIOR <br /> *APPROVED PER SI;OFFICE USE(S)PREVIOUSLY ESTABLISHED* <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 8/26/2021 8/26/2021 BLDG 09-FIRE KMK PARTIAL APPR see notes (8/26/2021 3:13 PM KMK) <br /> STOPPING/BLOCK Back side of South and East fire rated wall: <br /> Above grid has been fire taped and fire <br /> caulked <br /> (8/27/2021 8:48 AM KMK) <br /> South and east walls at 1 hour wall(above <br /> grid)have been fire taped and fire caulked <br /> 8/26/2021 8/26/2021 BLDG KMK NOT READY see notes (8/24/2021 2:00 PM AEA) <br /> 08-FRAMING Contact:Ray 425-244-8248 <br /> (8/26/2021 1:01 PM KMK) <br /> This inspection is for walls only.Call for <br /> electrical rough in inspections.Recall for <br /> framing when ready. <br /> (8/26/2021 3:17 PM KMK) <br /> Special note:Mechanical as it passes <br /> through rated wall has not been reviewed. <br /> Dampers may be required. <br /> 8/31/2021 8/31/2021 BLDG KMK PARTIAL APPR See notes (8/31/2021 3:41 PM KMK) <br /> 08-FRAMING Ok interior walls only for office(south)side <br /> only. <br /> Note:contractor states that fire alarm wires <br /> are not in wall. <br /> 9/9/2021 9/9/2021 BLDG KMK PARTIAL APPR (9/8/2021 2:41 PM AEA) <br /> 10-DRYWALL Contact:Ray 425-244-8248 <br /> (9/9/2021 12:39 PM KMK) <br /> Walls only below mechanical. <br /> 10/19/2021 10/19/2021 BLDG KMK OTHER Wrong permit called Paze east side 2nd floor <br /> 08-FRAMING 425 244-8248 <br /> (10/19/2021 3:28 PM KMK) <br /> Wrong permit called <br /> 10/27/2021 10/27/2021 BLDG 09-FIRE KMK APPROVAL RAY <br /> STOPPING/BLOCK 425-244-8248 <br /> RAY@ALLAMERICANDRYWAL.COM <br /> 10/28/2021 10/28/2021 BLDG 13-CEILING KMK NOT READY See notes RAY <br /> GRID 425-244-8248 <br /> RAY@ALLAMERICANDRYWAL.COM <br /> (10/28/2021 3:06 PM KMK) <br /> Complete mechanical inspection above <br /> grid.Include diffusers and fire dampers in <br /> the inspection. <br /> Recall for grid inspection when above has <br /> been completed <br /> INSP12 CyrYrEss, <br />
The URL can be used to link to this page
Your browser does not support the video tag.