Laserfiche WebLink
1/4/2022 Page 1 <br /> City of Everett <br /> 8:38:43AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. U2108-001 Site Address 7100 HARDESON RD <br /> Applied 8/2/2021 Applicant DAN FERGUSON Lot <br /> Approved 8/2/2021 Owner SNOHOMISH COUNTY PTBA Block <br /> Issued 8/2/2021 Contractor FABER CONSTRUCTION CORP Tract <br /> Parent Permit No. PW2107-006 Description SIDE SEWER ALTER.ATION/EXTENSION <br /> Notes <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 9/2/2021 9/2/2021 UTIL 04-SIDE JHK PARTIAL APPR (9/2/2021 11:35 AM JHK) <br /> SEWER Installing sewer pipe <br /> 9/8/2021 9/8/2021 UTIL 04-SIDE • JHK PARTIAL APPR (9/8/2021 2:00 PM JHK) <br /> SEWER Installing side sewer <br /> 9/9/2021 9/9/2021 UTIL 04-SIDE JHK PARTIAL APPR (9/9/2021 12:52 PM JHK) <br /> SEWER Installing side sewer <br /> 9/13/2021 9/13/2021 UTIL 03-SIDE JHK PARTIAL APPR (9/13/2021 12:38 PM JHK) <br /> SEWER Installing side sewer <br /> 9/20/2021 9/20/2021 UTIL 03-SIDE JHK PARTIAL APPR (9/20/2021 2:35 PM JHK) <br /> SEWER Installing side sewer <br /> 9/21/2021 9/21/2021 UTIL 03-SIDE JHK PARTIAL APPR (9/21/2021 2:24 PM JHK) <br /> SEWER Installing side sewer <br /> 9/22/2021 9/22/2021 UTIL 03-SIDE JHK PARTIAL APPR (9/22/2021 1:54 PM JHK) <br /> SEWER Side sewer installed <br /> 9/23/2021 9/23/2021 UTIL 04-SIDE JHK RESCHEDULE <br /> SEWER <br /> 10/5/2021 10/5/2021 UTIL 04-SIDE JHK PARTIAL APPR (10/5/2021 3:06 PM JHK) <br /> SEWER Testing side sewer <br /> 10/8/2021 10/8/2021 UTIL 04-SIDE JHK APPROVAL (10/8/2021 2:38 PM JHK) <br /> SEWER 6"PVC side sewer installed and tested per <br /> city standards.Will final permit at time of <br /> connection to building. <br /> 10/14/2021 10/14/2021 PW 17-CONCRETE JHK PARTIAL APPR (10/14/2021 1:32 PM JHK) <br /> PAVING FINAL Pouring concrete panels back. <br /> 10/22/2021 10/22/2021 PW 06-WATER IRK PARTIAL APPR (10/22/2021 11:57 AM JHK) <br /> MAIN INSTALL Digging out for valve install <br /> 10/25/2021 10/25/2021 PW 06-WATER JHK APPROVAL (10/25/2021 1:46 PM IHK) <br /> MAIN INSTALL City installing water valves and temporary <br /> blow off <br /> 10/26/2021 10/26/2021 PW 06-WATER JHK PARTIAL APPR (10/26/2021 1:55 PM JHK) <br /> MAIN INSTALL Installing water main <br /> 10/27/2021 10/27/2021 PW 06-WATER JHK PARTIAL APPR (10/27/2021 12:25 PM JHK) <br /> MAIN INSTALL Installing water pipe <br /> 1/4/2022 1/4/2022 UTIL 14-FINAL JHK APPRVD-PER.b <br /> INSP12 ,�firrr <br />