My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2810 104TH PL SE 2022-01-24
>
Address Records
>
104TH PL SE
>
2810
>
2810 104TH PL SE 2022-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 3:23:56 PM
Creation date
1/24/2022 3:23:42 PM
Metadata
Fields
Template:
Address Document
Street Name
104TH PL SE
Street Number
2810
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> �• WAC 29646B-94O: ELECTRICAL PLAN REVIEW <br /> EVERET.T <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to (a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item (a)-(ii, iii, or v) is selected,the work must also comply with section (a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> (a) Electrical plan review is not required for: <br /> ❑ (i) Low voltage systems; <br /> ®--❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution system <br /> ❑ <br /> does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> • (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii) For installations in(a)(ii), (iii), and(v)of this subsection to be considered,the following must be available <br /> ❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> 1-1 (b)Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this chapter. <br /> (c)If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table.900-1 Table 900.2 <br /> Health or Personal Care Facilities Educational and Institutional Facilities,Places of Assembly.or Other Facilities <br /> Health or Personal Care Facility Plan Review Educational,Institutional,or Plan.Review <br /> Type Required <br /> Other Facility Types Requires! <br /> Hospital Yes <br /> Horsing home unit or long-term Yes Educational Yes <br /> care unit instltutionai Yes <br /> Boarding home Yes <br /> Assisted living facility Yes <br /> Private alcoholism hospital Yes Notes to Tables 900.1 and 900-2. <br /> Private psychiatric hospital Yes 1..A city authorized to do electrical inspections <br /> Maternity home Yes may require plan review on facility types not <br /> Ambulatory surgery facility Yes reviewed by the department. <br /> Real hem:ce'ialysis clinic Yes <br /> Residential treatment facility Yes <br /> Enhanced service facility Yes <br /> Adult residential rehabilitation Yes PERMIT# Page 2-Plan Review <br /> center <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.