Laserfiche WebLink
• <br /> 2020 System Development Fee Calculations <br /> Permit#: - 7i804 CL 1G10-4—o \ Additional Notes: <br /> Project Address: 2217 Madison St Stormwater system development fees split on two separate permits: ground hard surfaces <br /> Project Name: SFR to duplex conversion calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions (Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Andrew Huang Date: 10/6/2020 <br /> Outside City Limits? No *Adds a 25%Surcharge � <br /> (16( 27) <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: `i Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> B-W2.689-66f-- Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br /> CW M0q--UCH Square Feet of New Plus Replaced Hard Surfaces: 118 SF <br /> Stormwater System Dev Fee: $30.20 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> PW2010-011 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 1,090 SF <br /> Stormwater System Dev Fee: $278.93 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />