Laserfiche WebLink
l Y v 1 <br /> GENERAL NOTES: <br /> SYMBOL DESCRIPTION KEY NOTES: <br /> 1. ALL DETAILS ARE SHOWN IN GENERAL TERMS. ACTUAL INSTALLATION AND GROUND ROD NOTES: III'''•���� _ <br /> ® COPPER GROUND ROD CONSTRUCTION MAY VARY DUE TO SITE SPECIFIC CONDITIONS. O CADWELD (TYP.) SEE SHEET E-4. D mobil. o° <br /> 2. GROUND ALL ANTENNA BASES, FRAMES, CABLE RUNS. AND OTHER METALLIC 1. ELECTRICAL CONTRACTOR SHALL ORDER GROUND RESISTANCE TESTING ONCE O ANTENNA GROUND BAR AT ANTENNA LEVEL OF POLE TIED <br /> • CADWELD COMPONENTS USING GROUND WIRES AND CONNECT TO SURFACE MOUNTED THE GROUND SYSTEM HAS BEEN INSTALLED; A QUALIFIED INDIVIDUAL, UTILIZING INTO TOWER GROUND BAR AT BASE OF POLE TIED INTO SITE <br /> BUS BARS. FOLLOW ANTENNA AND BTS MANUFACTURER'S PRACTICES FOR THE FALL OF POTENTIAL METHOD, SHOULD PERFORM THE TEST.THE REPORT GROUNDING JTJILM (V.I.F.) SEE SHEET E-4. <br /> GROUNDING REQUIREMENTS. GROUND COAX SHIELD AT BOTH ENDS AND EXIT WILL SHOW THE LOCATION OF THE TEST AND CONTAIN NO LESS THAN 9 TEST <br /> • EXOTHERMIC WELD FROM TOWER OR POLE USING MFR'S PRACTICES. POINTS ALONG THE TESTING UNE, GRAPHED OUT TO SHOW THE PLATEAU. O EQUIPMENT GROUND BAR TIED INTO EXTERIOR GROUND RING <br /> (V.I.F.) SEE SHEET E-4. <br /> 3. ALL GROUND CONNECTIONS SHALL BE CADWELD. ALL WIRES SHALL BE 2. POINT GROUND TEST OR 3 POINT 62% TESTS WILL NOT BE ACCEPTED AS <br /> ® TEST WELL COPPER THHN/THWN.ALL GROUND WIRE SHALL BE GREEN INSULATED WIRE ALTERNATIVES TO THE AFORE MENTIONED GROUND TESTS.TEST SHALL BE ® #6 AWG JUNCTION BOX GROUND TO EQUIPMENT GROUND <br /> ABOVE GROUND. PERFORMED WHILE THE COUNTERPOISE IS ISOLATED FROM THE A/C SYSTEM BAR (TYP). SEE SHEET E-4. <br /> GRIDS AND EXISTING COMMUNICATIONS FACILITY. <br /> GROUND BAR 4. CONTRACTOR TO VERIFY AND TEST GROUND SOURCE, GROUNDING AND OTHER 5 #6 AWG EQUIPMENT CABINET GROUND TO EQUIPMENT <br /> OPERATIONAL TESTING WILL BE WITNESSED BY CARRIER, REPRESENTATIVE. GROUND BAR (TYP). SEE SHEET E-4. <br /> �"'"N GROUND WIRE 5. REFERDM Y WITH GENERALQUI ELECTRIC; GENERAL ELECTRICAL PROVISION O #6r AWG ANTENNA MOUNT GROUND TO ANTENNA GROUND BAR Glotel. <br /> AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING STANDARDS. 6 (TYP). SEE SHEET E-4. <br /> -- #2 AWG GROUND RING 6. ELECTRICAL CONTRACTOR TO PROVIDE DETAILED DESIGN OF GROUNDING 7 #6 AWG RRH/RADIO/PENDANT MOUNT GROUND TO ANTENNA <br /> Sib IEN. AND RECEIVE APPROVAL OF DESIGN BY AUTHORIZED CARRIER, O GROUND BAR (TYP). SEE SHEET E-4.REPRESENT >IntegrityDeliveredTM <br /> FIELD VERIFY&TIE INTO DOCUMENT AALLECADWOELD5R 0AND�GROUND RINGSALLATION OF ROUNDINC JTJILM. PHOTO O ##6 AWG <br /> CUBE)GROUND <br /> OUNDE11 E INTO EXISTING GROUNDING <br /> EXISTING GROUNDING SYSTEM <br /> 7. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY DIFFICULTIES INSTALLING <br /> GROUNDING STJIEM DUE TO SITE SOIL CONDITIONS. 9 #2 AWG PPC GROUND TIED INTO EXISTING GROUNDING <br /> w 8. USE PANI SCHEME FOR LOADING GROUNDS ON MGB AS DISCUSSED IN NSTD SYSTEM (V.I.F.) SEE SHEET E-4. <br /> NOTE: <br /> 119, 33 & 36. #2 AWG H-FRAME/ICE BRIDGE POST GROUND TIED INTO GROUND HYBRID CABLES TOP & BOTTOM USING RIDS VERSION 4 <br /> m 10 EXISTING EXTERNAL GROUND RING (V.I.F.) SEE SHEET E-4. UNIVERSAL 1-5/8"GROUNDING STRAP, PART#252172 <br /> S <br /> R #S6 <br /> AWG <br /> TECH. LIGHT <br /> GROUND <br /> UNE-TIED INTO EXISTING GROUNDING <br /> 4. <br /> r / -A_ <br /> O'NEIL/ <br /> } SILVERLAKE N/ <br /> v. <br /> w / <br /> w / ._ PUD <br /> N <br /> 0 �` oTYP. /}/ x�.4- o SE01608E <br /> o TYP / <br /> w �� © } x f <br /> V +ti,� k 1331 112TH ST SE <br /> ie '� h ���� i� EVERETT,WA 98208 <br /> a SNOHOMISH COUNTY <br /> } } i <br /> a -' _ �/ ,/ // 4*;. , <br /> f_ 03-30-2021 M <br /> Fc VP <br /> / TYP. M q N <br /> o er ele en <br /> 4: <br /> / 0 <br /> te5-o•AGL RAD CENTER / / / O }• <br /> Q �F W A�y,,c� <br /> w <br /> / v <br /> o , . tie/ i 0 , . O <br /> 0 -,c-r8R) <br /> w <br /> �; \ / I <br /> / �W� ,0.3�inP0 ii OT P / �� i / <br /> 'O '�FG1 STE ��i <br /> a 111 <br /> A, ....,k0 ,,� h �/ �� © *ui S��NAL EN <br /> .. I, O / <br /> m ��,� / TYP © j ` EXPIRES 01-09-2022 JTMP O _`�- ', REVISIONS <br /> a ® Otr.hhieililli <br /> =_.)' b*" 1-I1 / REV. DATE DESCRIPTION BY <br /> d Ilkilel HI \ / A 00/09/11 ISSUED FOR 90X CO REVIEW OF <br /> N I I-ry----_ �I '�� 9 03/9T/TI ISSUED FOR 1001G CONSTRUCRON OF <br /> Z t58'-0'AGL RAD CENTER '} I ' MEM 'v <br /> / xkgrIFINIm TYP. / <br /> O116Aktilltil ion—a <br /> - <br /> / / / <br /> z ` LI jj _ <br /> TYP. \�, * <br /> C, <br /> N o TYPO ®�! '�,'1`l�� © k k / TITLE <br /> D f ar <br /> I' M 'Y SCHEMATIC GROUNDING PLANS <br /> �'�� M k ./ <br /> �,.t ��r.� k <br /> o f �,'/• SHEET 1 <br /> w <br /> Z \` <br /> z <br /> O <br /> E-3 <br /> C, <br /> z N A <br /> .4 ---- [ <br /> 'i RRH PLAN o, <br /> f54'-0•AGL MOUNT HEIGHT ��S <br /> 2 <br /> ./TRUE NORTH TRUE N RIH - <br /> 24"x36"SCALE. 1/2" = 1'-0" I I ANTENNA SCHEMATIC GROUNDING PLAN 2, 24•x36•SCALE: 1/2" = ,•-o• , , EQUIPMENT SCHEMATIC GROUNDING PLAN 1 (GLOTEL PROJECT#: J6561) <br /> 1 1"x17"SCALE: 1/4" = 1.-0" 2' 1' 0" 2' 1 1"z17•SCALE: 1/4" = 1'-0" 2' 1' 0" 2' <br /> 1 (a\ 1G\ <br />