Laserfiche WebLink
• <br /> Step 5. Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updating during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> existing carport, to be converted into a garage, existing single car garage <br /> (behind carport) to be converted into ADU space, the only new pervious area is <br /> 384 sq ft of gravel parking area, no other change beyond that <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> none <br /> How upstream drainage areas may affect the site: <br /> none <br /> Downstream drainage leading from the site to a receiving body of water: <br /> none <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> no, none <br /> Special requirements and provisions for working near or within critical areas: <br /> none <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 <br />