My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2114 MAPLE ST 2022-01-24
>
Address Records
>
MAPLE ST
>
2114
>
2114 MAPLE ST 2022-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 3:57:49 PM
Creation date
1/24/2022 3:56:46 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2114
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Step 5. Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updating during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> existing carport, to be converted into a garage, existing single car garage <br /> (behind carport) to be converted into ADU space, the only new pervious area is <br /> 384 sq ft of gravel parking area, no other change beyond that <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> none <br /> How upstream drainage areas may affect the site: <br /> none <br /> Downstream drainage leading from the site to a receiving body of water: <br /> none <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> no, none <br /> Special requirements and provisions for working near or within critical areas: <br /> none <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.