Laserfiche WebLink
• • <br /> Element 13. Protect low impact development: <br /> ❑ BMP C 102: BufferZones <br /> ❑ BMP C I03: High Visibility Plastic or Metal Fence <br /> ❑ BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207: Check Dams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C23 I: Brush Barrier <br /> ❑ BMP C233 Silt Fence <br /> ❑ BMP C 234:Vegetated Strip <br /> ❑ Other Per theSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> 0 Task 3: Construction SWPPP drawings <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> • Show on your TESC Plan all BMPs selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> • See City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction StormwaterPollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must also be prepared by or under the direction of a <br /> Washington State licensed professional engineer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in3 <br /> • the Combined Sewer Area-April2021 <br />