Laserfiche WebLink
• <br /> STEP 4. COMPLETE MINIMUM REQUIREMENTS <br /> The more information provided in these subsections typically corresponds to faster review and permit <br /> issuance times. Submitted checklists that lack the necessary information for review are considered <br /> incomplete and will be returned unprocessed to the applicant. <br /> Preparation of Stormwater Site Plan <br /> The purpose of this task is to convey all relevant information aboutthe proposed projectto the City for review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existing site conditions: <br /> flat lot <br /> Describe existing structures (location,type): <br /> existing house, no change...existing carport, to be converted into a garage, <br /> existing single car garage (behind carport) to be converted into ADU <br /> space...only new pervious area is 384 sq ft of gravel parking area, no change <br /> hPvnnd that <br /> Describe slopes on your site (flat, rolling, steep, %): <br /> 3" to 4" from front to back, over a 120' span <br /> Describe hard surfaces (roof, ground treatment): <br /> comp roofing to gutter and down spouts <br /> Describe vegetative surfaces (location, quantity ft2): <br /> grass with a few shrubs <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 <br />