My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 PINE ST 2022-01-25
>
Address Records
>
PINE ST
>
2215
>
2215 PINE ST 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 8:34:55 AM
Creation date
1/25/2022 8:33:46 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI NORKS PERMIT . Date Applied: 4/13/2020 <br /> City of Everett Permit Services Public Works Permit#: PW2004-009 <br /> EVERETT 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B2004-013 <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $376.02 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT SCHOOL DIST 2 STEVE LEE <br /> 4730 COLBY AVE <br /> EVERETT,WA,98203 <br /> PHONE: PHONE: 2065873797 <br /> TAX PARCEL ID#:00515746600000 SITE ADDRESS:2215 PINE ST <br /> DESCRIPTION:SITE WORK FOR PORTABLE RELOCATION <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 04/13/2020.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaces will be managed on-site in <br /> a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $50.00 <br /> Misc. Minor Permits $25.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee....$261.02 <br /> SUN 2 9 2020 <br /> CITY dr,EV <br /> Permit Services <br /> TEp <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> n may arise because of installation and maintenance of the <br /> Tle1401e 04/13/2020 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.