My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Hydro -demolition <br />dge and road surfacing <br />Design a Installation Specifications <br />. Vacuum s and cuttings during cutting and surfaciZasphalt <br />. Shiny and cutti s shall not remain on permanent co <br />overnight. <br />. Slurry and cuttings sh not drain to any natural nstructed drainage con- <br />veyance including storm con- <br />e systems. This y require temporarily blocking <br />catch basins, <br />. Dispose of collected slurry and c n m a manner that does not violate ground <br />water or surface water quality sta s. <br />. Do not allow process water g erated d ' g hydro -demolition, surface rough- <br />enZ <br />ilar operation drain to any n raI or constructed drainage con- <br />veuding sto ater systems. Dispo rocess water in a manner that <br />dolate g d water or surface water qu standards. <br />. Hdi se cleaning waste material and dem 'lion debris in a manner <br />thcause contamination of water. Dispose of s eping material from a <br />piper at an appropriate disposal site. <br />intetandards <br />Co nually monitor operations to determine whether slung, cuttings, or pNmeasure <br />uld enter waters of the state. If inspections show that a violation of watards could occur, stop operations and immediately implement preventive <br />as berms, barriers, seconda <br />ry containment, and vacuum trucks. <br />BMP C153: Material Delivery, Storage and Containment <br />Purpose <br />Prevent, reduce, or eliminate the discharge of pollutants to the stormwater system or <br />' watercourses from material delivery and storage. Minimize the storage of hazardous <br />materials on -site, store materials in a designated area, and install secondary con- <br />tainment. <br />Conditions of Use <br />These procedures are suitable for use at all construction sites with delivery and <br />storage of the following materials: <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11- Chapter 4 - Page 315 <br />SI1TS & HILL ENGINEERS, INC. 46 <br />' TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.